SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                                    7 MAY 2019


BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                         THE NEXT QUARTER

Infrastructure Planning, Design &
Delivery
Signage Policy - finalise signage               Finalised draft guidelines and               Refining signage requests process        Implement signage guidelines and
guideline & signage design criteria.              criteria for adoption by Director.             for inclusion in revised draft             criteria for use by staff.
                                                Reviewed the Local Government                  guidelines.                              Monitor and update as required.
                                                  Neutral Services Signs Public                Implement signage guidelines and
                                                  Places Guide 2019. Reference will              criteria for use by staff.
                                                  be made to this document in the              Monitor and update as required.
                                                  Noosa Signage Guidelines.
Streetscape Plans - progressive                Project      initiations  have      been      Reviewing base data available for        Concept development for Noosa
development of Streetscape Plans in              prepared for linking from Noosa                 Cooroy, Pomona, and Noosa                  Drive and Hasting Street precinct.
accordance with the Noosa Design                 Junction to Noosa Drive and the                 Junction and Gympie Terrace              Collate and review background
Principles                                       Hastings Street precinct for budget             precincts continues.                       information for each precinct.
                                                 consideration.                                Designs progressing for:
                                               A placemaking team meeting has                  o Noosa Parade, Noosa Heads
                                                 taken place and a presentation has
                                                 been made to Council outlining
                                                 Council’s new placemaking strategy.
Cooroy Hinterland Playground –                 Detail design documentation is being        Issue Project Management Plan              Finalise budgets for future stages of
design and construct an iconic                   finalised.                                  Assess project risks, benefits and           the project.
playground.                                                                                    budget.
                                                                                             Additional Councillor Workshop to
                                                                                                present final design for the
                                                                                                playground.
                                                                                             Formalise stakeholder consultation
                                                                                                plan and commence community
                                                                                                feedback sessions.
PTAIP DDA Bus stop compliance                  Commenced       construction    on          Finalisation and handover of bus           Prepare for 2019/2020 PTAIP DDA
program – continued delivery of the              remaining 4 bus stops scheduled for           stop program.                                Bus program.
program.                                         completion in May.
Park Road Boardwalk – supervise                Completion of project under budget            Preparation of maintenance manual        Actions for temporary path
project to ensure delivery on time and on        ahead of time.                                Consider actions for temporary path
budget.




                                                                                                                                                                  Page 59 of 71
Log in to download the original file

2019-05-07 Services & Organisation Committee Agenda(PDF, 4MB).pdf · 4.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.