Skip to the record
Every meeting, every word.

Council archive · source document

190910 AGLA Hill Street (10), Sunshine Beach issue D · MCU18/0006.02

Attached to the e-mail Generally in Accordance Application MCU18/0006.02 - Cover email - Plans.

of 3

Text shows just the words. Original shows the document exactly as it was published.

PLANTING SCHEDULE                                                                                                                                                                                                                                                                                GENERAL NOTES                                                                                                   SOIL:
                                                                                                                                                                                                                                                                                                                                                                                                                 Spread turf underlay topsoil to a minimum depth of 100mm unless otherwise directed. Proposed topsoil must
                                                                                                                                                                                                                                                                                                 A. ARCHITECTURAL WORKS INFORMATION                                                                              comply with Australian Standards AS4419-2003.
The spacing of plants shown on plan have been derived as a compromise between growth rate, anticipated size, and the ability to provide a good vegetative cover within a reasonable space of time. Quantities indicated have been based on the spacing of individual plants appropriate to the
available area for the particular species used; where this available area increases (or decreases) through the course of construction, quantities may also need to increase (or decrease) to maintain the plant spacings indicated on plan.                                                      Refer to Architect's drawings for all information contained within these documents related to and nominated
                                                                                                                                                                                                                                                                                                 as Architectural Works. This includes all hardscape items such as paving, outdoor structures/shelters, walls    TURF:
                                                                                                                                                                                                                                                                                                 and fencing. Architectural Works information contained within these documents are indicative only and not for   To be fundamentally free from weeds and disease or other deleterious substances.
CODE                 SPECIES                                                                          COMMON NAME                                        SIZE**                            QUANTITY                         SPACING                           HEIGHT*               WIDTH*       construction or certification purposes.                                                                         • On road reserve: Use "Wintergreen" (ie: Lawn Solutions Australia, contact 0432 707 950)
                                                                                                                                                                                                                                                                                                                                                                                                                 • Within subject site: Use "Platinum Zoysia" (ie: Lawn Solutions Australia, contact 0432 707 950)
                                                                                                                                                                                                                                                                                                 B. CIVIL WORKS INFORMATION
                                                                                                                                                                                                                                                                                                 Refer to Civil Engineer's drawings for all information contained within these documents related to and          INSTALLATION:
TREES                                                                                                                                                                                                                                                                                            nominated as Civil Works. Civil Works information contained within these documents are indicative only and      Turf shall be close turfed with staggered cross-joints and laid in straight lines, running perpendicular to the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ANDREW GOLD LANDSCAPE ARCHITECTURE
                                                                                                                                                                                                                                                                                                 not for construction or certification purposes.                                                                 contours.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PO BOX 5220
                                                                                                                                                                                                                                                                                                                                                                                                                 All joints shall be filled with an approved topdress light soil or sand and the turf shall be lightly rolled.                                        MT GRAVATT EAST
Bi                   Banksia integrifolia                                                             Coast Banksia                                      45L                               3                                as shown                          12                    5            C. STRUCTURAL WORKS INFORMATION                                                                                 Finished levels shall be 3mm below surrounding surface levels to allow for future top dressing. Allowance                                            QLD 4122
                                                                                                                                                                                                                                                                                                 Refer to Structural Engineer's drawings for all information contained within these documents related to and     should be made for shrinkage and settling.
Ca                   Cupaniopsis anacardioides                                                        Tuckeroo                                           45L                               2                                as shown                          10                    5                                                                                                                                                                                                                                                                                 T 07 3420 0006
                                                                                                                                                                                                                                                                                                 nominated as Structural Works. This includes retaining walls. Structural Works information contained within     Turf shall be adequately watered once installed.
Ghg                  Grevillea Honey Gem                                                              Grevillea                                          45L                               2                                as shown                          5                     4            these documents are indicative only and not for construction or certification purposes.                         Ensure protection from trampling.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      M 0405 389 243
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      E [email protected]
Pt                   Pandanus tectorius                                                               Screw Pine                                         25L                               1                                as shown                          5                     5
                                                                                                                                                                                                                                                                                                 D. ELECTRICAL WORKS INFORMATION                                                                                 FERTILISER:
                                                                                                                                                                                                                                                                                                 Refer to Electrical Engineer's drawings for all information contained within these documents related to and     Fertiliser to be applied to the turf at the rates and period of time from installation as recommended by the
SCREENING SHRUBS                                                                                                                                                                                                                                                                                 nominated as Electrical Works. Electrical Works information contained within these documents are indicative     supplier. If no starter Fertiliser supplied by the supplier, we recommend:
                                                                                                                                                                                                                                                                                                 and not for construction or certification purposes.                                                             Dynamic Lifter Turf Starter:
                                                                                                                                                                                                                                                                                                                                                                                                                 http://www.yates.com.au/products/fertilising/organic-based/dynamic-lifter-turf-starter/#tbCQXOZuFJZ01z1B.97
                                                                                                                                                                                                                                                                                                 E. HYDRAULIC WORKS INFORMATION                                                                                  Lawn Builder™ Seed & Turf Starter Slow Release Lawn Fertiliser:
CAL W                Callistemon Wildfire                                                             Bottlebrush                                        200mm                             3                                1.8                               2.5                   2            Refer to Hydraulic Engineer's drawings for all information contained within these documents related to and      https://www.scottsaustralia.com.au/scotts-brands/lawn-builder/lawn-builder-slow-release-lawn-fertilisers/
SYZ R                Syzygium australe Resilience                                                     Lillypilly                                         200mm                             2                                1.5                               3                     2.5          nominated as Hydraulic Works. Hydraulic Works information contained within these documents are indicative       lawn-builder-seed-turf-starter-slow-release-lawn-fertiliser/
                                                                                                                                                                                                                                                                                                 only and not for construction or certification purposes.
                                                                                                                                                                                                                                                                                                                                                                                                                 SOIL WETTING AGENT:
                                                                                                                                                                                                                                                                                                                                                                                                                 We recommend the application of a soil wetting agent wetting agent (ie: non biodegradable detergent not
SHRUBS AND GROUNDCOVERS                                                                                                                                                                                                                                                                          LANDSCAPE SPECIFICATION NOTES                                                                                   crystals ) to stop hydrophobia if not already in the starter fertiliser supplied with the turf, at the rates
                                                                                                                                                                                                                                                                                                                                                                                                                 recommended by the manufacturer:
                                                                                                                                                                                                                                                                                                 LEVELS-GENERAL NOTES                                                                                            • Scotts Hydraflow Wetta Soil
                                                                                                                                                                                                                                                                                                 Finish organic mulch surfaces 25 - 40mm below adjacent paving surfaces and/or edging. Finish lawn surfaces      • Searle’s Penetraide
BAN CC               Banksia spinulosa Coastal Cushion                                                Banksia                                            140mm                             8                                1                                 0.5                   1            flush with adjacent paving surfaces and/or edging. Ensure adequate falls in finished surface levels away from   • Plant of Health Soils Soaker
CAR gla              Carpobrotus glaucescens                                                          Pigface                                            140mm                             2                                1.5                               0.3                   3            buildings to drainage collection points (eg, field inlets, etc).
CAS CI               Casuarina glauca Cousin It                                                       Prostrate Casuarina                                140mm                             2                                1                                 0.3                   1.5                                                                                                                          WEEDS, PESTS DISEASE MANAGEMENT
                                                                                                                                                                                                                                                                                                 SUBSOIL DRAINAGE - GENERAL NOTES                                                                                Weeds are required to be removed by physical or chemical (Glyphosate or other herbicides) means. If
CRI ped              Crinum pedunculatum                                                              Swamp Lily                                         200mm                             6                                1                                 2                     2            Ensure adequate subsoil drainage elsewhere by installing suitable agricultural drainage systems where           chemical means, as per the manufacturer recommendations. Refer to the following reference for guideline on
GRE lan              Grevillea lanigera Mt Tamboritha                                                 Prostrate Grevillea                                140mm                             2                                1                                 0.5                   1.5          necessary, and especially in areas subjected to site excavation works including retaining walls.                weeds, pest and disease management
LOM KB               Lomandra Katie Belles                                                            Mat Rush                                           140mm                             25                               1                                 1.5                   1.5                                                                                                                          REFERENCE:
                                                                                                                                                                                                                                                                                                 PLANTS                                                                                                          http://thelawnguide.com.au
LOM ver              Lomandra Verday                                                                  Dwarf Lomandra                                     140mm                             74                               0.5                               0.5                   0.6
WES WG               Westringia Wynyabbie Gem                                                         Native Rosemary                                    140mm                             5                                1.5                               2                     1.5          • NATSPEC shall apply to trees where Council requires this certification.                                       SYNTHETIC TURF
WES Z                Westringia Zenda                                                                 Dwarf Rosemary                                     140mm                             13                               0.9                               1                     1            • Plants are to be good quality nursery stock from a NIASA Accredited nursery
                                                                                                                                                                                                                                                                                                 • They shall be fundamentally free of pest and diseases.                                                        Install synthetic turf (Urban Turf Solutions 1800 872 268, www.urbanturfsolutions.com.au) to the location as shown on the drawings.
                                                                                                                                                                                                                                                                                                 • After installation they shall be thoroughly watered.
                                                                                                                                                                                                                                                                                                                                                                                                                 PLANTING BEDS
                                                                                                                                                                                                                                                                                                 TURF
                                                                                                                                                                                                                                                                                                                                                                                                                 SUBGRADE PREPARATION:
                                                                                                                                                                                                                                                                                                 SUBGRADE PREPARATION:                                                                                           Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil.
                                                                                                                                                                                                                                                                                                 Turfed areas shall be prepared initially by removing all deleterious material
                                                                                                                                                                                                                                                                                                 Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil           TOPSOIL:
*HEIGHT AND WIDTH:                                                                                                                                                                                                                                                                               unless otherwise directed (ie: no cultivation under trees to be retained)                                       Spread topsoil to a minimum depth of 300mm unless otherwise directed. Proposed topsoil must comply with
                                                                                                                                                                                                                                                                                                                                                                                                                 Australian Standards AS4419-2003.
Heights and widths as shown are at full maturation, indicative only and dependent on environmental and microclimatic factors
                                                                                                                                                                                                                                                                                                                                                                                                                 FERTILIZER:
                                                                                                                                                                                                                                                                                                                                                                                                                 A slow slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported
                                                                                                                                                                                                                                                                                                                                                                                                                 (or excavated/site topsoil). We recommend the following:
** PLANT CONTAINER SIZE:                                                                                                                                                                                                                                                                                                                                                                                         Inorganic Slow or Controlled Release fertilisers:
                                                                                                                                                                                                                                                                                                                                                                                                                 • Osmocote
                                                                                                                                                                                                                                                                                                                                                                                                                 • Nutricote
                                                                                                                                                                                                                                                                                                                                                                                                                 • Macrocote
45L             45 Litre container stock min                                         Min. height at time of planting: 1.8m                                                                                                                                                                                                                                                                                       • E-Scape PRO by eCo-Enviroment
25L             25 Litre container stock min                                         Min. height at time of planting: 1m
200mm           200mm dia minimum pot size                                                                                                                                                                                                                                                                                                                                                                       Organic slow release:
                                                                                                                                                                                                                                                                                                                                                                                                                 • Dynamic Lifter
140mm           140mm dia minimum pot size
                                                                                                                                                                                                                                                                                                                                                                                                                 • Organic Link by Plant of Health

                                                                                                                                                                                                                                                                                                                                                                                                                 WETTING AGENT:
                                                                                                                                                                                                                                                                                                                                                                                                                 A wetting agent and/or soil ameliorant including a wetting agent is required to all mass planting beds:
MINIMUM STOCK SIZES                                                                                                                                                                                                                                                                                                                                                                                              • Scotts Hydraflow Wetta Soil
                                                                                                                                                                                                                                                                                                                                                                                                                 • Searle’s Penetraide Plant of Health Soils Soaker
The recommended minimum plant size relative to the container size is as follows. Should the stem calliper of height of the tree relative to
                                                                                                                                                                                                                                                                                                                                                                                                                 • Multipro by eCo-Enviroment
the container size be less than the figures shown, the tree should be rejected.

                                                                                                                                                                                                                                                                                                                                                                                                                 PLANTING:
Root ball volume                                Height (above container)                                   Calliper (at 300mm)                                Clear trunk height                                                                                                                                                                                                                                 As indicated on plan.

                                                                                                                                                                                                                                                                                                                                                                                                                 ORGANIC MULCHING:
45 litre                                        1.9 - 2.3 metres                                           30mm - 35mm                                        1200mm                                                                                                                                                                                                                                             Proposed mulch must comply with Australian Standards AS4419-2012. Spread 1" Hoop Bark (ie:
75 litre                                        2.2 - 2.4 metres                                           40mm - 45mm                                        1400mm                                                                                                                                                                                                                                             Greenfingers, contact 5546 1099) to a minimum depth of 100mm entirely over planting bed areas.
100 litre                                       2.4 metres                                                 50mm                                               1500mm
                                                                                                                                                                                                                                                                                                                                                                                                                 IRRIGATION
200 litre                                       3.6 metres                                                 60mm                                               1500mm
300 litre                                       4.2 metres                                                 70mm                                               1500mm                                                                                                                                                                                                                                             Planting plan has been designed to survive without an automatic irrigation system. Water additives and water
400 litre                                       5.5 metres                                                 70mm                                               1500mm                                                                                                                                                                                                                                             retention elements, along with hardy water-wise plants will ensure an irrigation system is not imperative to the
                                                                                                                                                                                                                                                                                                                                                                                                                 long-term maturation and survival of the proposed plants. If approved, install an automatic, fixed position, low
Palm trees                                      NA                                                         NA                                                 5 metres clear trunk                                                                                                                                                                                                                               pressure sprinkler irrigation system to all landscaped areas shown on the drawings internal to the site only, to
                                                                                                                                                                                                                                                                                                                                                                                                                 Noosa Shire Council approval. The irrigation shall meet the following performance requirements and as per
                                                                                                                                                                                                                                                                                                                                                                                                                 the manufacturers and/or installers specifications:

                                                                                                                                                                                                                                                                                                                                                                                                                 - Summer target application of 32mm
                                                                                                                                                                                                                                                                                                                                                                                                                 - Fully automatic and metered
                                                                                                                                                                                                                                                                                                                                                                                                                 - Recycled water use (from rainwater tanks)
                                                                                                                                                                                                                                                                                                                                                                                                                 - Commercial quality fittings and fixtures
                                                                                                                                                                                                                                                                                                                                                                                                                 - Mainlines
                                                                                                                                                                                                                                                                                                                                                                                                                 - Dripline system under mulch
                                                                                                                                                                                                                                                                                                                                                                                                                 - RPZ backflow prevent device

                                                                                                                                                                                                                                                                                                                                                                                                                 All design and documentation, materials supplied and work carried out should be in accordance with the
                                                                                                                                                                                                                                                                                                                                                                                                                 current relevant Australian Standards and best practice.

                                                                                                                                                                                                                                                                                                                                                                                                                 PLANT ESTABLISHMENT / CONTINUING MAINTENANCE

                                                                                                                                                                                                                                                                                                                                                                                                                 Allow a 12 WEEK Plant Establishment Period from Practical Completion to the satisfaction of the Landscape
                                                                                                                                                                                                                                                                                                                                                                                                                 Architect.
                                                                                                                                                                                                                                                                                                                                                                                                                 • Maintain adequate watering regime
                                                                                                                                                                                                                                                                                                                                                                                                                 • Remove weed growth from all mass planting beds and turfed areas                                                                     D           10/09/19         UPDATED ARCHITECTURAL DWGS
                                                                                                                                                                                                                                                                                                                                                                                                                 • Fertilise (as per the notes above)                                                                                                  C           17/07/19         AMENDMENTS AS REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                                 • Weed control (as per the notes above)                                                                                               B           17/07/19         UPDATED ARCHITECTURAL DWGS
                                                                                                                                                                                                                                                                                                                                                                                                                 • Prune planting, control pest and disease management (as per the notes above) to maintain healthy growth                             A           27/02/18         SUBMISSION TO NSC
                                                                                                                                                                                                                                                                                                                                                                                                                 • Replenish mulch material where necessary
                                                                                                                                                                                                                                                                                                                                                                                                                 • Replace dead / dying plant material                                                                                                 ISSUE       DATE            REASON
                                                                                                                                                                                                                                                                                                                                                                                                                 • Reinstate stakes, ties and marker stakes where necessary
                                                                                                                                                                                                                                                                                                                                                                                                                 • Reinstate erosion control matting and other erosion control measures as necessary
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE AT
                                                                                                                                                                                                                                                                                                                                                                                                                 Continue maintenance works beyond Plant Establishment Period as required.                                                             THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
                                                                                                                                                                                                                                                                                                                                                                                                                 MANAGEMENT PLANS:                                                                                                                     RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
                                                                                                                                                                                                                                                                                                                                                                                                                 The turfed areas shall be throughly watered on the day of turf installation and then as follows at the equivalent                     DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
                                                                                                                                                                                                                                                                                                                                                                                                                 of 5l/m², including natural rainfall, or as required to maintain active healthy growth.                                               DIMENSIONS ARE TO BE VERIFIED ON SITE.

                                                                                                                                                                                                                                                                                                                                                                                                                 Weeks 1-3: Twice a week
                                                                                                                                                                                                                                                                                                                                                                                                                 Weeks 3-12: Once a week or as necessary

                                                                                                                                                                                                                                                                                                                                                                                                                 If no irrigation, apply the above rates to the mass planting beds. Watering to use rainwater tanks if possible.

                                                                                                                                                                                                                                                                                                                                                                                                                 SPECIAL NOTE

                                                                                                                                                                                                                                                                                                                                                                                                                 Accord particular diligence to the following prime items:

                                                                                                                                                                                                                                                                                                                                                                                                                 TOPSOIL QUALITY and SUBGRADE PREPARATION as specified.                                                                                PROPOSED MULTI-UNIT DWELLING
                                                                                                                                                                                                                                                                                                                                                                                                                 PLANT QUANTITY: Use only consistently well nurtured nursery stock from an approved supplier. Check with                               10 HILL STREET, SUNSHINE BEACH
                                                                                                                                                                                                                                                                                                                                                                                                                 Landscape Architect where species substitutions must be made.

                                                                                                                                                                                                                                                                                                                                                                                                                 MAINTENANCE: Ensure a continuing maintenance program, including weed/disease, fertilising, watering (but
                                                                                                                                                                                                                                                                                                                                                                                                                 beware of over-watering) and replacement of ailing plant material.                                                                    NOTES, SCHEDULES, & DETAILS
                                                                                                                                                                                                                                                                                                                                                                                                                 GUARANTEE
                                                                                                                                                                                                                                                                                                                                                                                                                 Failure to adequately address these items, best practice and relevant Australian Standards WILL result in a
                                                                                                                                                                                                                                                                                                                                                                                                                 sub-standard landscape outcome.                                                                                                       JOB No.            SHEET No.                     ISSUE           DRAWN BY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       18.018             2                             D               AG/AL/CP

Used in these records

About this file

File size
519 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

190910 AGLA Hill Street (10), Sunshine Beach issue D.pdf · 519 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.