Original source · versioned page text
Attachment 1 - Tender Consideration Plan - Community Battery Grant
Plans and drawings: the text below has words only, no drawings.
Item Issue Term
Australian Energy Market Operator (AEMO)
Community Benefit Fund
Construction Completion (ie when the battery is on site on its pad)
• Mechanical Completion (ie when the battery is plugged in to the grid and operating)
• Practical Completion (ie when the battery has passed all tests and is working to the standards expected)
• Final Completion (ie after the DLP has expired)
Construction Period
Council means Noosa Shire Council
Council Representative is [Anne Nolan]
Defects
Deliverables
Design life
Distributed Network Service Provider or DNSP means Energex
Electricity Distribution Network means the electricity distribution network owned by Energex
Electricity Retailer means Acacia Energy, the nominated electrical retailer and aggregator of electricity sold in the
electricity market.
Equipment means the community battery and all related components, including items needed for Grid Connection
Fees means the fees payable to YEF for operation and maintenance of the Equipment during the O&M Period
Page | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original