Delegated Report - Code - Planning MCU22 0145 [As Published] · MCU22/0145
Site Access and Driveways
27. A sealed access driveway must be provided from Henderson Street to all parking and
manoeuvring areas of the development. The access must be generally in accordance with
the approved plans.
Car Parking
28. A minimum of 5 covered car parking spaces must be provided and made available for
carparking at all times. The car parking must be generally in accordance with the approved
plans and include in particular dimensions, crossfalls and gradients in accordance with
Australian Standard AS/NZS2890.1:2004 - Parking Facilities.
29. All vehicles must enter and exit the site in a forward gear.
30. Directional signage must be provided to direct visitors to the car parking spaces provided in
the basement.
Pedestrian and Bicycle Facilities
31. Pedestrian and bicycle facilities must be provided for the development. The works must
include widening of the existing footpath to 2 metres.
Condition 31 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be generally in accordance with the approved plans.
Services
33. Reticulated electricity and telecommunication services must be provided to each lot/unit in
accordance with the standards and requirements of the relevant service provider.
34. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
35. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
37. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
39. All earthworks and associated retaining structures/batters/anchors, both above and below
ground level, both temporary and permanent, must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
40. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 17 of 28
Document Set ID: 22322758
Version: 7, Version Date: 22/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0145 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.