Original source · versioned page text
2018-10-18 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 18 OCTOBER 2018
any boundary fencing must be setback a minimum of 1m from the boundary
and/or covenant areas. The area of land between the boundary or covenant
areas and the fence must be densely landscaped to screen the fence from
the street. The landscaped area must include 1 feature tree every 3m;
dense landscaping must be provided along the southern boundary to
effectively screen the development from the adjoining residential dwellings;
dense landscaping must be planted for the full frontage of Val Crescent to
screen the development. The plantings must include a mix of low, medium
and tall shrubs and trees and in particular;
i. include 12 x 100 litre native tree species along the Val Crescent
frontage between the driveway and the southern boundary of the site.
Proposed species must be submitted for operational works approval;
shrubs and trees along the Goodchap Street frontage must have a
minimum pot size of 200mm and must include 5 feature trees with a pot
size of 100 litres;
2 x 100 litre feature trees planted in each garden located near the building
either side of the porte cochere. The tree species chosen must have a
mature height of 8m or more;
provision of 1 street tree with a pot size of 100 litres for every 8 metres of
frontage;
provide a survey plan prepared by a suitably qualified person which
identifies the mature trees on site and their possible retention in particular
the trees near the site boundaries;
the large eucalypt tree near the proposed driveway in Val Crescent must
be retained. In this regard, an arborist report outlining measures to maintain
the health of the tree during the design, construction and operational phase
of the development must be submitted for operational works approval;
any vegetated water quality treatment system must be located to allow for
landscape screening of the development.
ENGINEERING
External Works
26. Goodchap Street and Val Crescent must be upgraded for the length of their
frontage to the subject site. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
reconstruction of any damaged kerb and channelling;
construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice;
removal of the existing property accesses and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage, including
the provision of topsoil and turf where the existing verge is grassed;
relocation/reinstatement of existing on-street parking bays required as a
result of development works;
linemarking for any potential additional on street parking spaces.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure and s128 being necessary trunk infrastructure identified by
Council’s LGIP to service the development.
Page 15 of 42
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.