SERVICES & ORGANISATION COMMITTEE MEETING REPORT 12th August 2025
Shire Wide Pathway Renewal
Footpath renewal works complete
at Gympie Terrace Noosaville
(pictured left) and Moorindil Street
Tewantin (pictured right).
Stormwater Drainage
Tewantin, 74 Goodchap Street
Upgraded stormwater network
complete. Works will eliminate a
frequent stormwater overflow
experienced during moderate to
severe rain events at 74
Goodchap Street.
Page 2 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Capital Program 2024/2025 Delivery Status · Attachment 1 - Capital Program Delivery StatusAttachmentsMeeting 891 · read item & discussion ↗
About this file
- File size
- 14.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.