26_04_27_AIA_JLTP_12-14 Gympie St
The Project Arborist is to be kept informed of the project designs and requirements, and is to
supervise on-site during the excavation works within the verge area.
Tree Protection Specifications are to be adhered to even in the absence of the Project Arborist.
Figure 7: Gympie Street Verge Tree Protection Plan
Blue Circles depicting calculated NRZ
Broken Purple Line = Exclusion / TPZ
26_04_27_AIA_JLTP_12-14 Gympie St Page 11 of 17