2022-06-28 Special Meeting - Item 2 - Attachment 1 - Operational Plan 22-23

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Corporate Plan Theme - Long Term Planning for Noosa Shire                                           Operational Plan 22/23
Corporate Plan Key     Operational Initiatives           Outcomes                                            Responsible Areas
Focus Areas
4.1 Adopt a new Town Continue to monitor and        Land use and development outcomes are                    Director
Planning Scheme      review as required through     aligned with the strategic intent of Noosa Plan          Environment &
                     amendments to the Noosa                                                                 Sustainable
                     Plan to ensure its application                                                          Development
                     continues to achieve strategic
                     objectives for sustainable
                     development
                       Continue rollout of Place         Measured improvement in liveability through         Director
                       Making project including          planning, design, and management of public          Environment &
                       identification of a pilot place   spaces                                              Sustainable
                       for the place program                                                                 Development
4.2 Implement an       Continue to implement         Transport options contribute positively to a            Director
integrated Transport   priority activities from the  strong economy, the health and wellbeing of the         Infrastructure
Strategy that          Noosa Transport Strategy      community and a low carbon future                       Services
encourages alternative Integrated transport and Land Planning for future transport and traffic               Strategic Land
transport usage and    Use modelling                 infrastructure requirements supports future             Use Planning
reduces our                                          development
dependence on
private motor vehicles Implement the Walking and     Facilitation of walking and cycling for transport,      Infrastructure
                       Cycling Strategy              recreation, health, and tourism                         Planning, Design
                                                                                                             & Delivery

                       Noosa Hinterland recreation       Increased recreational opportunities and          Environmental
                       trails upgrade/implement          improved multi use trails and linkages within the Services,
                       Noosa Trails Master Plan          trails network                                    Infrastructure
                       informed by an Audit of the                                                         Planning, Design
                       trail network                                                                       & Delivery.
                       Pathways expansion                Improved access and connectivity within the         Infrastructure
                                                         shire                                               Planning, Design
                                                                                                             & Delivery
                       Support free weekend buses        Incentivised public transport and reduced traffic   Infrastructure
                                                         congestion                                          Planning, Design
                                                                                                             & Delivery
                       Noosa Woods Ferry Jetty           Investigation of the Noosa River as a means of      Infrastructure
                       investigation                     public transportation and increased access to       Planning, Design
                                                         the Noosa Woods                                     & Delivery

                       Car Park Management               Improved travel information and parking             Infrastructure
                       Technology Trial                  management through innovative, intelligent          Planning, Design
                                                         parking and access control systems                  & Delivery

                       Undertake feasibility             Increased accessibility and contribute to a more Infrastructure
                       assessments for transit           sustainable transport system                     Planning, Design
                       HUBS Noosa Civic and                                                               & Delivery
                       Cooroy
                       Noosa Heads Multi Modal           Increased use of public transport and other         Infrastructure
                       facility design                   sustainable modes of transport                      Planning, Design
                                                                                                             & Delivery

                       E mobility trial                  Understand the physical and regulatory              Infrastructure
                                                         requirements and issues associated with the         Planning, Design
                                                         use of e-mobility devices across the shire          & Delivery




                                                            19
Log in to download the original file

2022-06-28 Special Meeting - Item 2 - Attachment 1 - Operational Plan 22-23(PDF, 2MB).pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.