2022-06-28 Special Meeting - Item 2 - Attachment 1 - Operational Plan 22-23
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnCorporate Plan Theme - Long Term Planning for Noosa Shire Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Areas
Focus Areas
4.1 Adopt a new Town Continue to monitor and Land use and development outcomes are Director
Planning Scheme review as required through aligned with the strategic intent of Noosa Plan Environment &
amendments to the Noosa Sustainable
Plan to ensure its application Development
continues to achieve strategic
objectives for sustainable
development
Continue rollout of Place Measured improvement in liveability through Director
Making project including planning, design, and management of public Environment &
identification of a pilot place spaces Sustainable
for the place program Development
4.2 Implement an Continue to implement Transport options contribute positively to a Director
integrated Transport priority activities from the strong economy, the health and wellbeing of the Infrastructure
Strategy that Noosa Transport Strategy community and a low carbon future Services
encourages alternative Integrated transport and Land Planning for future transport and traffic Strategic Land
transport usage and Use modelling infrastructure requirements supports future Use Planning
reduces our development
dependence on
private motor vehicles Implement the Walking and Facilitation of walking and cycling for transport, Infrastructure
Cycling Strategy recreation, health, and tourism Planning, Design
& Delivery
Noosa Hinterland recreation Increased recreational opportunities and Environmental
trails upgrade/implement improved multi use trails and linkages within the Services,
Noosa Trails Master Plan trails network Infrastructure
informed by an Audit of the Planning, Design
trail network & Delivery.
Pathways expansion Improved access and connectivity within the Infrastructure
shire Planning, Design
& Delivery
Support free weekend buses Incentivised public transport and reduced traffic Infrastructure
congestion Planning, Design
& Delivery
Noosa Woods Ferry Jetty Investigation of the Noosa River as a means of Infrastructure
investigation public transportation and increased access to Planning, Design
the Noosa Woods & Delivery
Car Park Management Improved travel information and parking Infrastructure
Technology Trial management through innovative, intelligent Planning, Design
parking and access control systems & Delivery
Undertake feasibility Increased accessibility and contribute to a more Infrastructure
assessments for transit sustainable transport system Planning, Design
HUBS Noosa Civic and & Delivery
Cooroy
Noosa Heads Multi Modal Increased use of public transport and other Infrastructure
facility design sustainable modes of transport Planning, Design
& Delivery
E mobility trial Understand the physical and regulatory Infrastructure
requirements and issues associated with the Planning, Design
use of e-mobility devices across the shire & Delivery
19