Log in to see the plans as drawnCorporate Plan Theme - Long Term Planning for Noosa Shire Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Areas
Focus Areas
4.3 Implement the Undertake non powered water Delivery of land use outcomes identified in the Community
Noosaville Foreshore sports feasibility study Noosa Foreshore Land Use Master Plan Development,
Land Use Property
Management Plan
4.4 Ensure effective Develop the new Noosa Council's long-term vision and strategic direction CEO
service planning Council Corporate Plan established and incorporated into the new
processes are in place Corporate Plan
Corporate review Increased organisational efficiencies and CEO
organisational capability
Progress the implementation Optimisation of landfill, control leachate and Waste &
of the Noosaville, Eumundi emissions capture Environmental
Road Landfill Master Plan Health
Landfill Treatment Options Optimisation of site operations and Waste &
Plan incorporation of various treatment options to Environmental
maximise life of landfill site Health
4.5 Develop and Note: To be considered in the To measure the environmental, social, and CEO
report on community development of the new economic health across communities
sustainability Corporate Plan
indicators
4.6 Meet the principles Ongoing Support of the A community led framework that meets the Environmental
of the UNESCO Man Noosa Biosphere Reserve balance between environment and sustainable Services
in the Biosphere Foundation human development
Program
4.7 Establish Finalise development of asset Asset management objectives are met, and full Asset Planning
functional Asset management plans for major suite of Asset Management Plans completed
Management Plans for asset classes by completing
all Council asset the Parks and Playgrounds
classes AMP
Complete a Cemetery Maximise use of existing cemetery sites and Waste &
Management Plan plan for future cemetery needs Environmental
Health
4.8 Undertake long Bridge Renewal Program Replacement and upgrading of bridges to Infrastructure
term financial improve the road network and to deliver Planning, Design
sustainability planning economic benefits and improved asset & Delivery
incorporating Asset management
Management Plan
outcomes
Asset management renewal Maintenance of assets to required standards Asset Planning
program and achievement of sustainable outcomes in
safety, minimising lifecycle, and project delivery
costs
Noosa Heads Parade Improve community connectivity and create a Infrastructure
Corridor storm water collective vision. Foster successful social Planning, Design
drainage upgrade networks and benefit multiple stakeholders & Delivery
20