1211 - Engineering Report Complete C · 132002.220527.1
Attached to the e-mail 132002.220527.1 Change to Existing Approval Engineering & Geo tech reports (1of 6 emails).
2.0 STORMWATER MANAGEMENT PLAN 2.1 Existing Stormwater Runoff from Webb Road One of the main reasons that the existing residence is often inundated with stormwater runoff, is because stormwater from Webb Road spills over the kerb and channel and runs down the private driveway to the house. As detailed on our Stormwater Management Plan No. 1211/P02 and on our driveway longsection Plan No. 1211/P03, this existing runoff from Webb Road will be redirected to the Council Stormwater pit in the kerb and channel as legally intended. This will be achieved by increasing the flood freeboard in the footpath by lifting the vertical curve crest in the new driveway, thus providing a bund against stormwater runoff from the road. 2.2 Existing Drainage System The ground floor level of the existing residence is RL15.85m. The driveway to the residence drops from RL20.9 at Webb Road to RL15.81m adjacent to the existing house. Attached Drawing No. 1211/P01 shows the layout of the existing driveway and residence. Due to the steep drop along the sealed driveway and the sealed forecourt in front of the house, stormwater runoff velocity is very significant by the time the stormwater reaches the existing house. Presently two grated drains, as shown on the attached Drawing No.1211/P01, have been installed to intercept stormwater runoff from the driveway and forecourt, upstream of the existing house. There is also a third open concrete drain on the north west boundary which intercepts stormwater from the adjacent property. Unfortunately the two grated drains in the driveway and the forecourt are often overtopped by Stormwater Runoff from storms greater than a 2 year ARI storm. As can be seen the floor level of the house at RL15.85m, is only 4cm higher than the grated drain which catches stormwater runoff immediately upstream of the house. The reason for this inundation is that the drains have not been designed for a 100 year ARI storm, they are often clogged by debris, and the drain level is only 4cm below the floor level of the house. As a consequence the existing residence is often inundated by stormwater runoff during short heavy storms (over a 2 year ARI storm). This is one of the main reasons the alterations are proposed for this residence. The only safe drainage system is to have an Engineering Report Page 2 of 11 1211-ENG-01_Version 1.0 (April 2015)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1211 - Engineering Report Complete C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.