Council archive · source document
1211 - Engineering Report Complete C · 132002.220527.1
Attached to the e-mail 132002.220527.1 Change to Existing Approval Engineering & Geo tech reports (1of 6 emails).
overflow drainage path that can never be blocked, and surface levels that grade away from the ground floor level of the house. 2.3 Proposed Drainage System Please refer to our attached Drawing No. 1211/P02 which shows the proposed new drainage system to the altered residence. There are several features to note: Firstly, all runoff from the driveway will be directed into a side entry gully pit (Council standard) which cannot be blocked (i.e the overflow from the grate is still intercepted in the side letterbox opening which is lower than the paved driveway). Secondly, the underground drainage system will be designed for a 10 year ARI storm event, which is much greater capacity than current system. Thirdly, the finished surface level of the driveway and forecourt will be lowered and graded away from the ground floor level of the house alterations. Finally and most importantly, an overflow flow path is diverted around the house. Therefore even if all the underground pipes become blocked, the surface levels will direct a 100 year ARI storm runoff away from the house and around the southern part of the house alteration. Therefore there will be no storm events that can inundate the altered house floor levels. 2.4 Stormwater Discharge Please refer to attached Geotechnical Report No.14169-001-RevO by Tectonic Geotechnical & Environmental Engineers. They were tasked with identifying a safe and secure method of discharging stormwater from the site, which did not cause erosion or instability to the site. To ensure stormwater runoff quality, every stormwater collection pit will be fitted with an approved filter basket to remove gross pollutants. Permeability results from the site show that a lined infiltration bore 5 metres downstream of the house provides the best solution for stormwater discharge. Please refer to our Drawing No. 1211/P02 which shows the infiltration bore proposed. The proposed Engineering Report Page 3 of 11 1211-ENG-01_Version 1.0 (April 2015)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1211 - Engineering Report Complete C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.