Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2018-09-20 Ordinary Meeting Minutes

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                               20 SEPTEMBER 2018


              d.   be planted as part of the first stage of development.
        10.   Landscaping must be provided in-between the cabins as they are constructed.
              The landscaping must be in accordance with Council’s Planning Scheme Policy
              PSP 3 Landscaping Plants and Guidelines.
        Staging
        11.   The development may be staged in accordance with the stages shown on the
              Approved Plans. The development need not be completed sequentially in the
              stage order indicated on the Approved Plans provided the landscaping and
              carparking area to service the development and associated services are
              constructed as part of the first stage.
        Nature and Extent of Approved Use
        12.   The total number of cabins must not exceed 6 and a maximum of 2 bedrooms
              per cabin.
        13.   The cabins must be used for short term visitor accommodation only. The cabins
              must not be used for permanent accommodation.
        Water Supply
        14.   The development must be provided with a potable water supply connected to
              each cabin. The storage capacity of the potable water supply must be a
              minimum of 4000 litres per cabin.
        Waste Water Treatment and Disposal
        15.   The development must be provided with an on-site waste water treatment and
              effluent disposal system having a capacity sufficient for the use*.
              *(Refer to Advisory Note)
        Waste Storage
        16.   Waste storage and disposal facilities must be provided in accordance with
              Planning Scheme Policy 9, Waste Management.
        17.   All refuse and recycling containers must be suitably screened from neighbouring
              properties.
        ENGINEERING
        Site Access and Driveways
        18.   Approval from the Department of Transport and Main Roads for the final design
              and construction of the site access and driveway works must be submitted in
              writing to Council prior to the commencement of the use.
        Car Parking
        19.   A minimum of 7 car parking spaces must be provided and marked on the site as
              part of the first stage of development. The carparking area must be designed by
              a suitably qualified person and must be constructed with:
              a.   a suitably bound surface that minimises the impacts of dust and noise on
                   the proposed development and the adjoining property;
              b.   dimensions, crossfalls and gradients in accordance with Australian
                   Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant
                   user class.
        Stormwater Drainage
        20.   Stormwater runoff from the development must be disposed of on-site without
              causing scour or damage to the subject site or any adjoining property.



                                                                              Page 12 of 15
Log in to download the original file

2018-09-20 Ordinary Meeting Minutes(PDF, 376KB).pdf · 385 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.