ORDINARY MEETING MINUTES 20 SEPTEMBER 2018
d. be planted as part of the first stage of development.
10. Landscaping must be provided in-between the cabins as they are constructed.
The landscaping must be in accordance with Council’s Planning Scheme Policy
PSP 3 Landscaping Plants and Guidelines.
Staging
11. The development may be staged in accordance with the stages shown on the
Approved Plans. The development need not be completed sequentially in the
stage order indicated on the Approved Plans provided the landscaping and
carparking area to service the development and associated services are
constructed as part of the first stage.
Nature and Extent of Approved Use
12. The total number of cabins must not exceed 6 and a maximum of 2 bedrooms
per cabin.
13. The cabins must be used for short term visitor accommodation only. The cabins
must not be used for permanent accommodation.
Water Supply
14. The development must be provided with a potable water supply connected to
each cabin. The storage capacity of the potable water supply must be a
minimum of 4000 litres per cabin.
Waste Water Treatment and Disposal
15. The development must be provided with an on-site waste water treatment and
effluent disposal system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Waste Storage
16. Waste storage and disposal facilities must be provided in accordance with
Planning Scheme Policy 9, Waste Management.
17. All refuse and recycling containers must be suitably screened from neighbouring
properties.
ENGINEERING
Site Access and Driveways
18. Approval from the Department of Transport and Main Roads for the final design
and construction of the site access and driveway works must be submitted in
writing to Council prior to the commencement of the use.
Car Parking
19. A minimum of 7 car parking spaces must be provided and marked on the site as
part of the first stage of development. The carparking area must be designed by
a suitably qualified person and must be constructed with:
a. a suitably bound surface that minimises the impacts of dust and noise on
the proposed development and the adjoining property;
b. dimensions, crossfalls and gradients in accordance with Australian
Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant
user class.
Stormwater Drainage
20. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.