Unitywater Interim Connections Policy
¢ Standard Connections;
e« Other Connections; and
¢ Staged Connections.
a. Standard Connections
Standard Connections are limited to Connections that:
* are located inside the Connection Area; and
« comply with Unitywater's criteria for Standard Connections (refer Schedule 1, Table 1
- Criteria and Conditions for Standard Connections).
The request and Standard Connection is also subject to compliance with Standard
Conditions identified in this Policy and the charges set out in Unitywaters Fees and
Charges Schedule.)
Schedule 1, Table 1 - Criteria and Conditions for Standard Connections sets out
Unitywater's Connections Criteria and conditions for Standard Connections.
b. Other Connections
This category covers any Connection other than a Standard Connection or a Staged
Connection (i.e. Other Connections).
Examples of the types of Connections in this category may include:
e Connections associated with changes of use, building work or subdivisions that will
be finalised in a single application (i.e. the Connection will not be staged);
« Connections including a material change in infrastructure or a material change in
demand; and
« Connections outside of Unitywaters Connection Area or Unitywater's Future
Connection Area (other than a Staged Connection).
Connections in this category may involve the construction of Property Service
Infrastructure and/or Network Infrastructure.
An applicant may submit detailed works design plans simultaneously to seeking
approval to connect to the existing network, if the nature and extent of new Network
Infrastructure works associated with the Connection are known (e.g. new reticulation
infrastructure for a subdivision estate),
Schedule 1, Table 2 - Connection Criteria for Other Connections sets out the Connection
Criteria that Unitywater will assess applications in this category against.
c. Staged Connections
Copyright ® Unitywater Page 3 of 26
Printed copies are uncontrolled.
Page 56 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.