PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   20 MAY 2014




                                                                 Page 61 of 143

Document No: "[Click to insert document #]"
                                                                                                                                    Revision No: 001
                                                                                                                          Effective date: 6 March 2014           —
                                                                                                                       Next Review Date: 30 May 2014
   Unit   Vve il tT                                             .                    .               -                             >      .
        y                                               Interim Connections                    Policy — Schedule 1: Criteria

 Table 1 - Criteria and Conditions for Standard Connections
                                                       Schedule 1, Table 1 — only applies for Connections that comply with the criteria for a Standard Connection
   real Te      ol  ae                      Standard Connections Criteria                                       STEN CE     mee tellers
    ose ser ei seas ede           (These Connections Criteria must be satisfied for a Connection to be      (These conditions apply to all Standard
    weld te nn Rant ee td                      within the Standard Connection category)                                 Otel sTi treet) |
           Pts t b9|                                                            2
 Water Connection Area         New water Connection or the Alteration or disconnection of an | «+         Installation by Unitywater of any required
                               existing water Connection in a Water Connection Area If:                   Property Service   Infrastructure and  water
                               e   A single 20 or 25 mm (inner diameter (ID)) Property Service             ee     én   oe           with   —_Unitywater's
                                   Connection to a single residential lot for a class 1 or 10 building.   published standards,
                               ©   Excluding                                                          ¢   Payment of all charges levied by Unitywater
                                                                                                          on the land before Connection is effected;
                                   o   Connections to water reticulation mains greater or equal to                 Ss                   ‘
                                       300mm (ID);                                                    ¢   The Applicant to be responsible for all the
                                               j        =               :                      1 -        costs   involved  in  installing any  private
                                   °   Connections requiring  the extension of Unky weiss existing        pressure booster pump on the land, including
                                       water reticulation mains (Network Infrastructure);                 purchase, installation and maintenance costs:
                                   o   Connections to lots that are not completely within the water | ,   Any installed private pressure booster pump
                                       Connection Area.                                                   must not cause negative pressure at the point
                                                                                                          of supply from Unitywater's water supply main;
                                                                                                      e   The Water Approval lapses 4 years after the
                                                                                                          date the Water Approval takes effect.
Recycled               Water | New Recycled Water Connection or the Alteration or disconnection | »       Installation by Unitywater of any required
 Connection Area               of an existing Recycled Water Connection in a Recycled Water               Property  Service  Infrastructure and  water
                               Connection Area if:                                                        meter   in   accordance   with   Unitywater's
                               e   A single 20 or 25 mm (ID) Property Service Connection to a single      published standards;
  Copyright © Unitywater                                                                                                              Page 8 of 26
 Printed copes are uncontrolied

                                                                                                                                                   Page 61 of 143
Log in to download the original file

2014-05-20 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.