PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   20 MAY 2014




                                                                 Page 62 of 143

Document No: "[Click to insert document #]"
                                                                                                                                    Revision No: 001
                                                                                                                           Effective date: 6 March 2014
                                                                                                                       Next Review Date: 30 May 2014            -
  Unit   Ve itt I                                               .                    +               .                             ‘      e     o
       y                                               Interim Connections                     Policy — Schedule 1: Criteria

  Connection Area                          Standard Connections Criteria                                        Standard Conditions
 Selec     Pelee                 (These Connections Criteria must be satisfied for a Connection to be       (These conditions apply to all Standard
   a hate ee                                  within the Standard Connection category)                                  eTey iil elelit})
           PN cet t9
                                  residential lot for a class 1 or 10 building.                       e   Payment of all charges levied by Unitywater
                              «Excluding:                                                                 on the land before Connection is effected;
                                  o   Connections to water reticulation mains greater or equal to 300 | *» The Applicant to be responsible for all the
                                      mm (ID);                                                            costs  involved   in  installing any  private
                                  o   Connections requiring the extension of Unitywater’s existing        pressure booster pump on the land, ean
                                      water reticulation mains (Network Infrastructure):                  purchase, installation and maintenance costs;
                                  o   Connections to lots that are not completely within the water    |*  Any installed private pressure booster pump
                                      Connection Area.                                                    must not incur negative pressure at the point
                                                                                                          of supply from Unitywater’s water supply main;
                                                                                                      e   The Water Approval lapses 4 years after the
                                                                                                          date the Water Approval takes effect.
Sewerage        Connection | New Sewerage Connection or the Alteration or disconnection of an | «         Installation by Unitywater of any required
Area                          existing Sewerage Connection in a Sewerage Connection Area if:              Property Service Infrastructure in accordance
                              e   Asingle 100 mm sewerage Property Service Connection to a single         with Unitywater's published standards;
                                  residential lot for a class 1 or 10 building.                       e   Payment of all charges levied by Unitywater
                              e   Excluding:                                                              on the land before Connection is effected;
                                  ©   Connections to lots that are partly or completely below the Q100 | ® The Applicant to be responsible for all the
                                      flood level (or equivalent) in the relevant council planning        costs involved in installing any private sewer
                                      scheme:                                                             pump    on  the   land,  including purchase,
                                                                                                          installation and maintenance costs.;
                                  o   Connections to sewers that are greater than 300 mm (ID);
                                              .                                               ;       e   The Water Approval lapses 4 years after the
                                  o   Connections to sewers that are at depths greater than 3 m;          date the Water Approval takes effect,
 Copyright © Unitywater                                                                                                               Page 9 of 26
Printed copies are uncontrolled

                                                                                                                                                Page 62 of 143
Log in to download the original file

2014-05-20 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.