PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014
Page 62 of 143
Document No: "[Click to insert document #]"
Revision No: 001
Effective date: 6 March 2014
Next Review Date: 30 May 2014 -
Unit Ve itt I . + . ‘ e o
y Interim Connections Policy — Schedule 1: Criteria
Connection Area Standard Connections Criteria Standard Conditions
Selec Pelee (These Connections Criteria must be satisfied for a Connection to be (These conditions apply to all Standard
a hate ee within the Standard Connection category) eTey iil elelit})
PN cet t9
residential lot for a class 1 or 10 building. e Payment of all charges levied by Unitywater
«Excluding: on the land before Connection is effected;
o Connections to water reticulation mains greater or equal to 300 | *» The Applicant to be responsible for all the
mm (ID); costs involved in installing any private
o Connections requiring the extension of Unitywater’s existing pressure booster pump on the land, ean
water reticulation mains (Network Infrastructure): purchase, installation and maintenance costs;
o Connections to lots that are not completely within the water |* Any installed private pressure booster pump
Connection Area. must not incur negative pressure at the point
of supply from Unitywater’s water supply main;
e The Water Approval lapses 4 years after the
date the Water Approval takes effect.
Sewerage Connection | New Sewerage Connection or the Alteration or disconnection of an | « Installation by Unitywater of any required
Area existing Sewerage Connection in a Sewerage Connection Area if: Property Service Infrastructure in accordance
e Asingle 100 mm sewerage Property Service Connection to a single with Unitywater's published standards;
residential lot for a class 1 or 10 building. e Payment of all charges levied by Unitywater
e Excluding: on the land before Connection is effected;
© Connections to lots that are partly or completely below the Q100 | ® The Applicant to be responsible for all the
flood level (or equivalent) in the relevant council planning costs involved in installing any private sewer
scheme: pump on the land, including purchase,
installation and maintenance costs.;
o Connections to sewers that are greater than 300 mm (ID);
. ; e The Water Approval lapses 4 years after the
o Connections to sewers that are at depths greater than 3 m; date the Water Approval takes effect,
Copyright © Unitywater Page 9 of 26
Printed copies are uncontrolled
Page 62 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.