Skip to the record
Accept no imitations.

Original source · versioned page text

2014-05-20 Planning & Organisation Committee Agenda

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   20 MAY 2014




                                                                 Page 68 of 143

Document No: "{Click to insert document #]"
                                                                                                                                        Revision No: 001
                                                                                                                              Effective date: 6 March 2014        F
                                                                                                                           Next Review Date: 30 May 2014
  Unit    \\ if ii f if                                           .                    .-               .                              =      -     .
        a                                                Interim Connections                      Policy — Schedule 1: Criteria

Table 3 - Connection Criteria for Staged Connections
                        Schedule 1, Table 3 — applies to Connections that involve Network Infrastructure works or Connections that are staged over two or more approvals

       Location                         Connection                                                Connection Criteria
 (Where the land is located)     (The type of Connection sought)                        (The application is assessed against these criteria)
Inside a Connection Area
Water Connection Area         New   water   Connection    or  the | Initial Staged Application
                                an oe ceceeyee             Bene        The availability of relevant infrastructure to service the land;
                              existing water Connection.
                                                                   e   The demands generated by the use or the proposed use, including fire flow
                                                                       demands;
                                                                   e   The existing and planned capacity available in the relevant network and the impacts
                                                                       of the demand on the standards of service;
                                                                   e   Any constraints affecting the Connection of infrastructure and the provision of the
                                                                       relevant service to the land or the supply of the relevant level of service to other
                                                                       customers;
                                                                    e   If works design plans included in the application — the technical feasibility of the
                                                                       engineering design and its compliance with the SEQ WS & S Design and
                                                                       Construction Code.
                                                                        Note: s. 99BRAG of the Act also requires applications to be assessed against the SEQ WS & S Design
                                                                        and Construction Code.
                                                                    Subsequent Staged Application
                                                                    e  As for first stage to the extent the matter has not already been assessed in the first or
                                                                       a previous stage;
                                                                    e« Any matter required to be assessed under a condition imposed on a previous stage.
 Copyright © Unitywater                                                                                                                 Page 15 of 26
Printed copies are uncontrolled

                                                                                                                                                 Page 68 of 143
Log in to download the original file

2014-05-20 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.