PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014
Page 67 of 143
Document No: "[Click to insert document #]"
Revision No: 001
Effective date: 6 March 2014 —
Next Review Date: 30 May 2014
Unitywater . . . 5 ie
yas Interim Connections Policy — Schedule 1: Criteria
Connection. biological/chemical loads;
e The existing and planned capacity available in the relevant network
and the impacts of the demand on the standards of service;
*« Impacts of the Connection on existing and/or planned services and
infrastructure in relevant Connection or Future Connection Areas,
including standard of service impacts:
e Any constraints affecting the Connection of infrastructure and the
provision of the relevant service to the land or the supply of the
relevant level of service to other customers;
e If works design plans included in the application — the technical
feasibility of the engineering design and its compliance with the SEQ
WS & S Design and Construction Code.
Copyright © Unitywater Page 14 of 26
Drintad ennine ara unnnanienilart
Page 67 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.