Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

08/0255 - MCU - Detached House [As Published] · 132008.255

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish
habitat areas

Ityou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the
Wild Rivers Code.

If you answered YES to Q5 and ticked box i} in
Q6, your application is required to be referred
tothe EPA.

Note: if specified works are proposed in a
local government area, it is prescribed tidal
work — the relevant local govemment will be
the assessment manager with the EPA as a
concurrence agency

If you answered YES to QS, and ticked box ii)
or iii) in Q6, your application requires referral
to DPIF,

Ifyou answered NO to Q6 and ticked box i) in
Q6, the application will not be accepted.

Ityou answered NO to QS, ticked box ii} in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must
be assessed against and must comply with the
Wild Rivers Code. Applications for purposes
other than specified works or as described
above will not be accepted.

If you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works
are ina PA. These applications must be
assessed against and must comply with the
Wild Rivers Code. The application will not be
accepted if the developments proposed to be
located in a HPA.

For more information about specified works

fefer to Guide 27

IDAS Assessment Checklist, Version 20, 2 April 2007, ===

| 5_-|s-the-development for specified works? (See definition in the Wild Rivers Act 2005 and Guide

27- Development in a wild river area)
mie Olyes
The application is for one or more of the following:

O i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); oF

O ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

oO iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form
1).

 

Residential, commercial or
industrial development

ff you answered YES to Q7, your application is
Not subject to wild river requirements.
Provided there are no other aspects of this
development that require assessment against
the relevant wild river declaration or Wild
Rivers Code, you do not need to complete the
femaining questions in Section 2.

If you answered NO to Q7 and ticked elther
box i) or ii) in Q8, the assessing agency is the
televant local government. The application
must be assessed against and must comply
with the Wild Rivers Code.

~ Is the application for residential, commercial or industrial development in a designated urban

area?
imine Olyes
If NO, does the application for residential, commercial or industrial development involve:

O i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

C7 ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

lf you answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of
animal husbandry activities see the Wild
Rivers Act 2005 and refer to Guide 27.
Agricultural activities,

if you answered YES to Q10, your application
tequires assessment against and must comply
with the Witd Rivers Code.

The assessing agency is NRW.

Note: Applications far agricultural activities will
not be accepted if proposed in a HPA. For
more details and a definition of agricultural
activities see the Wild Rivers Act 2005 and
refer to Guide 27.

The production of fodder in a PA, and pasture
improvement using low impact soit disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

11.

Does the application involve a material change of use for animal husbandry activities (as
defined under the Wild Rivers Act 2005) in a PA?

(No oO YES (ensure you have completed Part R of Form 1)

Does the application involve agricultural activities {as defined under the Wild Rivers Act 2005)
in a PA?

LIno

If YES is the application for:

oO YES (ensure you have completed Part Q of Form 1)

LJ i) a material change of use; or

LC ii) operational works.

Page 12

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0255 - MCU - Detached House [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.