Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

08/0255 - MCU - Detached House [As Published] · 132008.255

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

INTEGRATED PLANNING ACT 1997
Works.that- take overland-flow water—

The relevant wild river dectaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

If you ficked Q13 i), your application must be
assessed by NRW against the Wild Rivers
Code and must comply with the code.

If you ticked Q13 ii) an application is not
Tequired to be made however the works must
comply with the relevant self-assessable
section of the Wild Rivers Code, otherwise the
works become assessable development for
which an application is required and must be
assessed by NRW against the relevant part of
the Wild Rivers Code and must comply with
the code.

lf you ticked Q13 iii) your application is not
‘Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable
or exempt will not be accepted.

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overland flow water
that are either self assessable, assessable or
exempt from wild river requirements,

Ifyou ticked Q15 |), your application must be
assessed by NRW against the Wild Rivers
Code and must comply with the code.
Ifyou ticked Q15 ii) an application is not
fequired to be made however the works must
comply with the relevant self-assessable
section of the Wild Rivers Code, otherwise the
works become assessable development for
which an application is required and must be
assessed by NRW against the relevant part of
.. the Wild Rivers Cade and must comply with:
the code,
if you ticked Q15 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable
or exempt will not be accepted.

Waterway barrier works

Applications for building ar raising waterway
barrier works in a HPA will not be accepted,
if you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

13.

14,

15,

16.

(DAS Assessment Checklist, Version, 20, 2. April. 2002 __—

L]No

If YES, is the application for works stated in the relevant wild river declaration to be?
(i) assessable works

oO YES (ensure you have completed Part Ks of Form 1)

(_] ii) self-assessable works

(J iii) exempt works

Does the application involve works that interfere with overland flow water in a FMA?
O NO DO YES (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
(Ji) self-assessable works

(1 it) exempt works

Does the application involve building or raising waterway barrier works in a PA?
(no i) YES (ensure you have completed Part O3 of Form 1)

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not
be accepted.

Ifyou answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Works that interfere with water in a
watercourse

Note: If the development is proposed in a
HPA, applications for all works that interfere
with water in a watercourse (including dams or
weirs, stream realignment or stream diversion)
will not be accepted.

In a PA, applications for instream dams and
weirs may be accepted In nominated
waterways. If you ticked box ii) in Q19, your
application will not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www.nrw.qid.qov.au or contacting the
department by email on:

wild [email protected],

18.

19.

 

Does the application involve aquaculture in a PA?
LINo (1 YES (ensure you have completed Part O; of Form 1)

Does the application involve operational works that interfere with water in a watercourse that is
in a nominated waterway in a PA?

oO NO O YES (ensure you have completed the relevant Part K of Form 1)

If YES,
CO i) The application is for an instream dam or weir, or

(_J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Page 13

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0255 - MCU - Detached House [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.