Original source · versioned page text
Planning Report
Sewer
The existing dwelling on new lot 1 has an existing septic sewer system and infiltration trenches. It is proposed to retain this
system for the existing dwelling which is fully self-contained on the new proposed Lot 1. Aussie Soil Investigations has prepared
an effluent disposal report for proposed Lot 2, which confirms the site is suitable for an on-site management system. The report
recommends:
▪ Employment of an advanced secondary aerated wastewater treatment systems with surface spray or covered sub-surface
drip irrigation.
▪ Adoption of a minimum land application area of 240m2 for a category 5 site be provided for a typical 4 bedroom dwelling
with a maximum population of 6 people (the report notes that an area of 9270m2 is available for the disposal of effluent).
Stormwater
Roofwater from the existing house on the site discharges into the dry gully east of the house that feeds into the existing dam
located in the eastern section of the lot. It is proposed that this arrangement be retained. Roofwater from any new dwelling
constructed on the newly created lot 2 would similarly be discharged onto natural ground east of the dwelling, and allowed to
sheet flow to the existing gully within the lot on the eastern boundary.
Electricity, gas and telecommunications
Electricity and telecommunications infrastructure are available to the proposed development.
www.thereforgroup.com.au Planning Report | 24-0565P 9 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original