Documentation Requirements for change of level applications
Attached to the e-mail MCU16/0081 - Energex request to applicant for further information.
2
The drawings shall be based on a survey of the Energex assets which shall be carried out by a
licenced surveyor. The survey shall include the following:
Profile of the ground along the line of the lowest conductor(s)
Any ground features higher than the general surroundings in the vicinity of the conductors
Ground level at the base of the Energex structure
Conductor and insulator attachment points
Minimum of 5 points along the length of the catenary(s) and the ground level below
Time and date of the survey
Ambient weather conditions including
o Temperature (in shade)
o Wind speed
o Cloud cover (sunny, some cloud, overcast, rain etc)
The drawing shall show the conductor at its maximum operating temperature (in profile) and show
the blowout condition in plan (500Pa wind at 35degC).
Energex will supply the developer with:
The type of conductor
The feeder load at the time of the survey
The maximum operating temperature of the feeder
The electrical calculations shall be carried out by an appropriately qualified RPEQ to determine
the conductor position at maximum operating temperature and the conductor blowout.
The drawing(s) shall contain a table of survey points and a table showing:
Time and date of survey
Feeder Load at time of survey
Ambient weather conditions at time of survey
Conductor type
Maximum Operating Temperature
Calculated tension at 15Deg C
The drawing(s) shall be signed by the RPEQ.
DISTRIBUTION
This memorandum is for internal Energex purposes and shall not be distributed to external
parties.
THINGS TO NOTE
Design group does not generally support the erection of permanent structures on an
easement.
Design group does not support the installation of swimming pools or the like in an easement.
Advice provided by design is for the purpose of Energex to assess the application it is not to be
relied upon by the applicant for any other purpose – it is the applicant’s responsibility to ensure
that they meet all legal, safety and other requirements
This shall be read in conjunction with WP1323.
James Canning
Principal Transmission Design Engineer
Y:\Transmission\Users\James Canning\Easements\Documentation Requirements.docx/22-Mar-16
See the original