Skip to the record
Search everything, all in one place.

Council archive · source document

Amended Early Referral Agency Response - Planning RAP23 0011 02 (1) (As Published) · RAP23/0011.02

of 7

Text shows just the words. Original shows the document exactly as it was published.

                 •      The development application to the assessment manager is made within 1 year of the
                        date of this referral agency response.
                 4.     REFERRAL AGENCY CONDITIONS

                        When Conditions must be Complied With
                 1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with
                        prior to the use of the building commencing, and then compliance maintained at all times
                        while the use continues.
                        Approved Plans
                 2.     Development authorised by this approval must be undertaken generally in accordance
                        with the Approved Plans listed in the table/s below.

                          Plan No.         Rev.   Plan/Document Name                              Date

                          C1.0             -      Site Plan prepared by Chris Clout Design        27/02/26

                          C1.1             -      Lower Floor Plan prepared by Chris Clout 27/02/26
                                                  Design

                          C1.2             -      Ground Floor Plan prepared by Christ 27/02/26
                                                  Clout

                          C1.3             -      Upper Floor Plan prepared by Chris Clout 27/02/26
                                                  Design

                          C2.0             -      Elevation – Front / East prepared by Chris 27/02/26
                                                  Clout Design

                          C2.1             -      Elevation – Rear / West prepared by Chris 27/02/26
                                                  Clout Design

                          C2.2             -      Elevation – North prepared by Chris Clout 27/02/26
                                                  Design

                          C2.3             -      Elevation – South prepared by Chris Clout 27/02/26
                                                  Design

                          C3.0             -      Section 1 prepared by Chris Clout Design        27/02/26

                          C3.1             -      Section 2 prepared by Chris Clout Design        27/02/26

                          C3.2             -      Section 3 prepared by Chris Clout Design        27/02/26

                          C3.3             -      Section 4 prepared by Chris Clout Design        27/02/26

                          C10              -      Height Blanket prepared by Chris Clout 27/02/26
                                                  Design

                          C20              -      Street View Perspectives prepared by Chris 27/02/26
                                                  Clout Design




                                                                                                         Page 2 of 7
Document Set ID: 24802520
Version: 3, Version Date: 21/05/2026
Log in to download the original file

Amended Early Referral Agency Response - Planning RAP23 0011 02 (1) (As Published).pdf · 120 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.