Code Assessment
Performance outcomes Acceptable outcomes Compliance
not in a water service area, an adequate, reliable, an accessible dam, swimming pool or water tank
safely located and freely accessible water supply is available for firefighting purposes with an onsite water
provided for fire fighting purposes, which is in addition volume of not less than 5,000 litres; and
to day to day water supply. a water supply outlet pipe 50 millimetres in diameter
and fitted with a standard fire brigade fitting
connected to the water supply (other than where the
water supply is in a swimming pool or dam).
PO16 AO16.1 Complies
Development is designed and sited to ensure risk to Where the development is located in the Flood Hazard The proposed finished floor levels of 5.2m AHD are
people and property from flooding is avoided or Area as shown on Flood Hazard Overlay Map in above the 3.5m AHD required by the planning scheme.
minimised. Schedule 2, the finished floor level of habitable rooms
is at least 300 millimetres above the Defined flood
event (DFE).
AO16.2 Not applicable
Where the DFE has not been modelled for the area, See above.
the finished floor level of habitable rooms is at least
500 millimetres above the highest recorded flood.
PO17 AO17 Not applicable
Underground car parking areas are designed to drain No acceptable outcome provided Underground parking areas are not proposed.
and function safely during a flood event and power
failure.
PO18 AO18.1 Complies
Development is sufficiently separated from major Development including any sensitive land uses is at There are no such uses in the proximity.
electricity infrastructure and substations to minimise least:
the likelihood of nuisance or complaint. 50 metres from a transmission substation;
10 metres from any other substation; and
30 metres from a transmission line easement.
PO19 AO19 Can comply
Development is located and designed to avoid or Noise emissions do not exceed 5db(A) above This will be looked at during the building certification
minimise noise nuisance from the use of background noise level internal to a habitable building stage.
infrastructure. measured in accordance with AS1055.