Code Assessment

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                                      Acceptable outcomes                                     Compliance
PO20                                                      AO20                                                  Not applicable
Wherever practicable habitable buildings are              Where adjoining substations or major electricity No such uses are nearby.
orientated to avoid direct overlooking of major           infrastructure, habitable buildings are orientated so
electricity infrastructure or substations.                that the majority of outdoor living areas and windows
                                                          of habitable rooms face away from the infrastructure.
PO21                                                      AO21                                                 Not applicable
Earthworks and drainage operational works do not          Filling other than accessways:                       No filling is proposed.
directly, indirectly or cumulatively cause adverse        does not extend more than the equivalent of 3 metres
impacts external to the development site by:              around the main building, measured from the outer
causing ponding of water on the site or nearby land;      walls of the building;
increasing flooding, which adversely affects the safety   is limited to a maximum of 500m2; and
or use of any land upstream and downstream;               does not impact on the local drainage of adjoining
adversely affecting the flow of water in any overland     properties.
flow path; and
adversely affecting the privacy or visual amenity of
surrounding property.
PO22                                                      AO22.1                                                   Complies
Development maintains the safety of people, property      Development, including associated access, is not The site is not within the Landside hazard overlay.
and hazardous materials stored in bulk from the risk of   located on land identified as a landslide hazard area on
landslide.                                                a Landslide Hazard Overlay Map.
                                                          AO22.2                                                Complies
                                                          Development, including associated access, is located The site is not within the Landside hazard overlay.
                                                          outside moderate, high and very high landslide hazard
                                                          areas and areas with 15% slope or greater, as
                                                          determined by a site-specific slope-analysis.

                                                          OR
                                                          AO22.3                                                 Not applicable
                                                          A site-specific geotechnical assessment is prepared by The site is not within the Landside hazard overlay.
                                                          a registered professional engineer to certify that:
Log in to download the original file

Code Assessment.pdf · 293 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.