Performance outcomes Acceptable outcomes Compliance
the stability of the site, including associated buildings
and infrastructure, will be maintained and operational
for the life of the development;
the site is not subject to the risk of landslide activity
originating from other land, including land above the
site; and
development of the site will not increase the risk of
landslide activity on other land.
AO22.4 Not applicable
Any specific measures identified in a site specific The site is not within the Landside hazard overlay.
geotechnical assessment for stabilising the site or
development are to be fully implemented.
Flood Hazard Overlay Code
Performance outcomes Acceptable outcomes Compliance
Floodplain protection, immunity and safety - for development areas
PO1 AO1 Complies
Development provides that for all flood events up to The finished flood level is not less than the minimum The proposed finished floor levels of 5.2m AHD are
and including the DFE : design levels specified in Table 8.2.6.4 well above the required 3.5m AHD.
(a) the safety of people on the site is protected; and
(b) the risk of damage to property on the site is
avoided or minimised as far as practicable.
Earthworks
PO10 AO10 Not applicable
Excavation and filling for operational works only occur Filling, other than accessways: No filling is proposed as part of the development.
where they: