Performance outcomes                                    Acceptable outcomes                                         Compliance
                                                        the stability of the site, including associated buildings
                                                        and infrastructure, will be maintained and operational
                                                        for the life of the development;
                                                        the site is not subject to the risk of landslide activity
                                                        originating from other land, including land above the
                                                        site; and
                                                        development of the site will not increase the risk of
                                                        landslide activity on other land.
                                                        AO22.4                                              Not applicable
                                                        Any specific measures identified in a site specific The site is not within the Landside hazard overlay.
                                                        geotechnical assessment for stabilising the site or
                                                        development are to be fully implemented.




                                                               Flood Hazard Overlay Code

Performance outcomes                                    Acceptable outcomes                                         Compliance
Floodplain protection, immunity and safety - for development areas
PO1                                                    AO1                                                 Complies
Development provides that for all flood events up to The finished flood level is not less than the minimum The proposed finished floor levels of 5.2m AHD are
and including the DFE :                                design levels specified in Table 8.2.6.4            well above the required 3.5m AHD.
(a) the safety of people on the site is protected; and
(b) the risk of damage to property on the site is
avoided or minimised as far as practicable.
Earthworks
PO10                                                    AO10                                                        Not applicable
Excavation and filling for operational works only occur Filling, other than accessways:                             No filling is proposed as part of the development.
where they:
Log in to download the original file

Code Assessment.pdf · 293 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.