Council archive · source document
App2.4 Program Preventative Maintenance Agreement · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
(SCHEDULE 5 )
Plant, Planters and Growing Medium - Inspection and Maintenance Matrix:
Inspection Procedure as
Area of Inspection Necessary Action
Inspection Item applicable to detailed/general
Attention Frequency
inspections
Check for loss of integrity of 6 Visits per
Inspect each planter box, cover If damage is affecting plant growth
growing annum total
and mulch layer at close range then repair or replacements are to
medium/planters/mulch and with detailed
for signs of loss of integrity as be initiated
any related adverse plant and general
applicable to visit type
growth problems inspections
conducted
between
above- Repair of replace irrigation drip lines
mentioned The medium should neither be if damaged or faulty
Check moisture levels of
visits, saturated or dry, rather uniformly Adjust levels of irrigation if growing
growing medium
moist medium excessively wet or
excessively dry
General
Check general plant growth Inspection General / detailed inspection of As necessary, removal of struggling
condition – are all or only required all plant species growing in plant species and or overplant with
some healthy 6 times year panels as appropriate to visit another more suitable plant species
General Check for weeds growing / from within As Above Remove weeds
gardening Check for signs of disease or the building Remove and clean affected species.
and review pest damage to plants and on each As Above If problem persists spray with
of growing growing medium respective insecticide
medium & floor Conduct soil tests to monitor Appropriate adjustments to manage
attachment Total dissolved Salt and pH soil chemistry will be made, as
structures Check for uncontrolled or & levels required
over-growth General / detailed inspection of
Detailed Prune and remove excess plant
all plant species growing in
Inspection material.
panels as appropriate to visit
required 5
times a year
from
specialist
access Check fertilising regime report,
equipment to ensure nutrients are
Monitor plant nutrient maintained at appropriate levels. Apply controlled release fertilizer in
requirements Visits to be Observe condition of plants, in Spring
spread terms of nutrient availability
evenly over symptoms
the 12
month
period
Fytowall (Australia) Form FWF-10 / Rev D Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App2.4 Program Preventative Maintenance Agreement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 635 KB (small file)
- File type
No other editions are linked here.