Council archive · source document
App2.4 Program Preventative Maintenance Agreement · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
(SCHEDULE 6 )
Drainage and Irrigation
General Inspection and Maintenance Matrix:
Inspection Inspection Procedure as applicable Necessary Action
Area of Attention Inspection Item
Frequency to detailed/general inspections
Check all drainage points for
Check all drainage Detailed accumulation of fallen debris,
points (where Inspection leaves and weeds at all drainage Remove and clean drainage points
accessible) required 5 points throughout the green
times facade system
Automated
a year
Irrigation and
System Check for blockages or Repair or replace drainage drip lines
Irrigation drip line Visits to be
Generally irregularities in dripper apertures if damaged or faulty
spread evenly
over the 12
Irrigation drip-line Check for blocks or breaks in the
month period
primary connection irrigation hose by conducting Repair or replace faulty hose
points at low level general irrigation test sections
Fytowall (Australia) Form FWF-10 / Rev D Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App2.4 Program Preventative Maintenance Agreement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 635 KB (small file)
- File type
No other editions are linked here.