Attachment C- REC14.0005 Negotiated Decision Notice
REC14/0005 ENGINEERING External Works 7. Gateway Drive must be upgraded for the length of its frontage to the subject site. The works must be undertaken in accordance with an Operational Works approval and must include in particular the construction of a pedestrian footpath in accordance with the conditions of this Decision Notice. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. Pedestrian and Bicycle Facilities 8. Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular a 2 metre wide footpath within the road verge extending from the end of the existing pathway in Gateway Drive to the northern boundary of proposed Lot 103. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non- trunk infrastructure. Stormwater Drainage 9. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and must include in particular: (a) A connection point for the future development of proposed Lot 103 to the existing stormwater drainage system (b) The retention of the existing overland flowpath that conveys stormwater runoff from the adjoining property (Lot 26 SP151406) through proposed Lot 103. The flows must be contained and conveyed wholly within a combined drainage solution consisting of underground drainage, capable of accommodating flows up to a Q10 event, and a landscaped and suitably stabilised (rock lined or other engineered alternative) open drain. The design of the drain must be sufficient to include all design storm events up to and including the 1%AEP event of critical duration. Design calculations (that include at a minimum depth of flow and velocity) and certification by a suitably qualified RPEQ demonstrating the above must be submitted as part of the operational works application (c) Additional elements in the design of the open drain (localised bunding etc) that allows stormwater flows from the minor storm event to enter the existing piped system and ensure that velocities (generated in both the major and minor events) are in accordance with the safety guidelines recommended in QUDM. Electricity and Telecommunication Services 10. Underground reticulated electricity and telecommunication services must be provided to each lot in accordance with an approval for Operational Works and the standards and requirements of the relevant service provider. 11. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. 12. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Page 3 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original