NOOSA COUNCIL IDAS Development Application Decision Notice                                                10 of 14


Erosion and Sediment Control
78.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
79.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
       various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
       amounts under the current Council policies and requirements is outlined in the table below:

          Contribution Required For:                                                          Amount:

          PSP12 – Public Open Space Contributions (Park)                                      $2,933
          PSP16 – Sewerage Headworks Contributions                                            $5,599
          PSP17 – Water Supply Headworks Contributions                                        $5,617
          PSP20 – Pathway Trunk Network Contributions                                         $659
          Local Roadworks Contributions                                                       $642
          TOTAL Contribution Amount =                                                         $ 15,450
          Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
          from March 2007 until the date of payment.
       All contributions must be paid prior Council endorsement of the plan of survey.

Site Stability
80.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
       best suited for the proposed development. The recommendations of this report shall be incorporated into
       the design and construction of the proposed development.
General
81.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
       specifications for all engineering works, which shall be submitted in conjunction with an application for a
       Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the
       proposed cadastre layout is to be submitted in conjunction with any application for Operational Works.

82.    Digital detailed designs including drawings, calculations, specifications etc, shall be submitted with any
       application for a Development Permit for Operational Works in respect of roadworks and stormwater
       drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 –
       Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict with underground
       pipes or services, all existing and proposed services required by the development shall be shown on the
       plans.

83.    To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
       in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
       available at www.adac.com.au).

84.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

85.    Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant
       shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
       kerb and gutter, or other Council property damaged as a result of construction of the proposed
       development.
       If any person acting under this permit damages any Council property or facilities (such as underground
       drainage, water supply and sewerage), through any cause whatsoever in the course of, directly or
       indirectly carrying out development, that person shall forthwith notify the Manager - Land Development
       and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land
       Development. Alternatively, the Applicant may request the Council to carry out the rectification works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Used in these records

About this file

File size
68 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07-0070 NEGOTIATED Decision Notice [As Published].pdf · 68 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.