NOOSA COUNCIL IDAS Development Application Decision Notice                                                11 of 14


      Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
      undertaken by either Council or a Council approved contractor.
      In all cases, Council reserves the right to carry out rectification works in an emergency and where no
      reasonable attempt has been made to complete the rectification works as part of the development. All
      costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of
      the Plan of Survey.
86.   The transportation of all materials to and from the site shall be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
      be covered to prevent materials including dust being windblown from the vehicle.

87.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
      intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
      and structures. All of which shall be submitted to Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage structures,
      finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
      As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
      www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied and
      accepted by Council.
88.   Where operational works are likely to affect nearby residents, at least 3 days notice of commencement of
      work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to
      affected residents.

89.   Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the
      requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this
      regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1)
      of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the
      levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment
      manager.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc05b25d\@[email protected]

Used in these records

About this file

File size
68 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07-0070 NEGOTIATED Decision Notice [As Published].pdf · 68 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.