Amended Noosa Project Restoration Plan V12_5
Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn i. Number and type of
compliant received
ii. The types, number
and severity of any
acts of wilful
vandalism
iii. The type and
severity of any boat
strike
4. Additional potential affects
Deleterious interaction Adopt minimum Prior to deployment of Modify oyster reef
with marine plants distances between substrate check for patches as per Section
mapped marine plants marine plants visually 8.6 Contingency plan.
and construction at the site and adjust
works as per the works to avoid, if Report changes in
specifications marine plants found associated plant
marine plant
communities and
Post deployment remediation actions in
survey and mapping of annual report.
‘as built’ structures in
relation to marine
plans and submit to
plants
authorities with RPEQ
certification
Annually - monitor
changes in nearby marine
plant communities
70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.