RFI traffic updated 2016

Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

The SIDRA results show that the intersection configuration with the development will continue to operate adequately in
future year 2028 at worst DOS 0.82 being for the Pearsons Road intersection approach during the 2028 AM peak hour
with the development. For the Elm Street intersection approaches during the 2028 AM and PM peak hours, the worst
DOS is 0.56 with the development, which indicates that there is reserve capacity at the major approaches. The SIDRA
modelling results show that all of the traffic operations output parameters are within the bounds of what are considered to
be satisfactory operational conditions for the 10 year development horizon scenario.

The detailed design of all intersection turn treatments are to be undertaken in accordance with the relevant design
standards and guidelines.

3.2.2     ELM STREET (COOROY CONNECTION ROAD) / LAMONTS ROAD INTERSECTION

The anticipated development traffic movements at this intersection is up to 55vph total in each peak hour period
throughout the assessment period. The total background traffic anticipated in the base year 2018 at the intersection is in
the order of 1,492vph in the AM Peak and 1,546vph in the PM peak. The development traffic as a proportion of the total
background traffic movements at the intersection in the base year 2018 is less than 5%, being 3.7% in the AM peak and
3.6% in the PM peak. In the design year 2028, the proportion of the development traffic is 2.6% in the AM peak and 2.5%
in the PM peak. This is well below the general 5% threshold that triggers more detailed assessments. Notwithstanding, it
is understood that a commitment exists to upgrade the intersection configuration to re-align the Lamonts Road approach.
The proposed intersection works also include the provision of a right turn lane and left turn lane treatments. Please refer
to Council’s Development Works Approval No. 132007.2398.02 and the functional road layout plan by Calibre Consulting
Drawing 15-001261-RF01 shown in Figure 3-4.




Figure 3-4: Road Functional Layout Plan for Elm Street / Lamonts Road (DA Ref: 132007.2398.02)


B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                     COOROY RETIREMENT COMMUNITY            | 15
Log in to download the original file

RFI traffic updated 2016.pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.