Original source · versioned page text
RFI traffic updated 2016
Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.
Figure 3-3: Road Functional Layout Plan for Elm Street / Pearsons Road (DA Ref: 132007.2398.02)
The proposed intersection configuration as shown in Figure 3-3 was assessed in SIDRA for the future design horizon
year 2028. In accordance with GARID, the SIDRA results are reported for the scenario without the development (no
intersection upgrade) and with the development (with intersection upgrade). The SIDRA results are summarised below.
Table 3-2: Elm Street (Cooroy Connection Road) / Pearsons Road intersection SIDRA assessment outcomes for 2028
Design Year – priority control (give-way sign) with and without development
Degree of Level of 95th Percentile Delay
Scenario Saturation Service (LOS) Queue Length (m) (s)
2028 AM Peak Hour – without 0.55 B 29 4
development traffic
2028 AM Peak Hour – with development 0.82 D 31 49
traffic & intersection upgrade
2028 PM Peak Hour – without 0.44 A 47 4
development traffic
2028 PM Peak Hour – with development 0.40 B 7 21
traffic & intersection upgrade
B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.