Skip to the record
Beware of cheap imitations.

Original source · versioned page text

RFI traffic updated 2016

Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Performance outcomes                              Acceptable outcomes                                                 Response   Comment
                                                  safety of the Guide to Development in a Transport Environment:
                                                  Rail, Department of Transport and Main Roads, 2015, provides
                                                  guidance on how to comply with this acceptable outcome.
                                                  AND

                                                  AO3.4 Upgrades to a level crossing are designed and                 N/A
                                                  constructed in accordance with AS1742.7 – Manual of
                                                  uniform traffic control devices, Part 7: Railway crossings
                                                  and applicable rail manager standard drawings.
                                                  AND


                                                  AO3.5 Access points achieve sufficient clearance from a             N/A
                                                  level crossing in accordance with AS1742.7 – Manual of
                                                  uniform traffic control devices, Part 7: Railway crossings
                                                  by providing a minimum clearance of 5 metres from the
                                                  edge running rail (outer rail) plus the length of the largest
                                                  vehicle anticipated on-site.
                                                  AND


                                                  AO3.6 On-site vehicle circulation is designed to give               
                                                  priority to entering vehicles at all times.
State-controlled roads
PO4 Development does not compromise               No acceptable outcome is prescribed.                                          Refer to the Traffic Impact Assessment.
the safe and efficient management or
operation of state-controlled roads.
Editor’s note: A traffic impact assessment will
assist in addressing this performance
outcome.
PO5 Development does not compromise               AO5.1 The layout and design of the development                      
planned upgrades of the state-controlled          accommodates planned upgrades of the state-controlled
road network or delivery of future state-         road.
controlled roads.                                 AND
Editor’s note: Written advice from DTMR that
there are no planned upgrades of state-
controlled roads or future state-controlled       AO5.2 The layout and design of the development                      
roads which will be compromised by the            accommodates the delivery of future state-controlled
development will assist in addressing this
performance outcome.
                                                  roads.
                                                  Editor’s note: To demonstrate compliance with this acceptable
                                                  outcome, it is recommended that a traffic impact assessment be




State development assessment provisions                           Module 19 — State transport network functionality                   19.2 Transport infrastructure and network design state code
23 November 2015 V1.7                                                                                                                                                                    Page 2 of 3
Log in to download the original file

RFI traffic updated 2016.pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.