Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.
Performance outcomes Acceptable outcomes Response Comment
safety of the Guide to Development in a Transport Environment:
Rail, Department of Transport and Main Roads, 2015, provides
guidance on how to comply with this acceptable outcome.
AND
AO3.4 Upgrades to a level crossing are designed and N/A
constructed in accordance with AS1742.7 – Manual of
uniform traffic control devices, Part 7: Railway crossings
and applicable rail manager standard drawings.
AND
AO3.5 Access points achieve sufficient clearance from a N/A
level crossing in accordance with AS1742.7 – Manual of
uniform traffic control devices, Part 7: Railway crossings
by providing a minimum clearance of 5 metres from the
edge running rail (outer rail) plus the length of the largest
vehicle anticipated on-site.
AND
AO3.6 On-site vehicle circulation is designed to give
priority to entering vehicles at all times.
State-controlled roads
PO4 Development does not compromise No acceptable outcome is prescribed. Refer to the Traffic Impact Assessment.
the safe and efficient management or
operation of state-controlled roads.
Editor’s note: A traffic impact assessment will
assist in addressing this performance
outcome.
PO5 Development does not compromise AO5.1 The layout and design of the development
planned upgrades of the state-controlled accommodates planned upgrades of the state-controlled
road network or delivery of future state- road.
controlled roads. AND
Editor’s note: Written advice from DTMR that
there are no planned upgrades of state-
controlled roads or future state-controlled AO5.2 The layout and design of the development
roads which will be compromised by the accommodates the delivery of future state-controlled
development will assist in addressing this
performance outcome.
roads.
Editor’s note: To demonstrate compliance with this acceptable
outcome, it is recommended that a traffic impact assessment be
State development assessment provisions Module 19 — State transport network functionality 19.2 Transport infrastructure and network design state code
23 November 2015 V1.7 Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.