Original source · versioned page text
15-001261-TN01.WA
Attached to the e-mail MCU15/0111 - Addendum request to change a development approval - 2-4 Lamonts Rd & 19 Trading Post Rd, Cooroy.
TECHNICAL NOTE Project: Palm Lake Cooroy – Resort and Aged Care Development Subject: Elm Street/Pearson Road Intersection Upgrade and Staging Clarification Date: 7 December 2016 Our Ref: 15-001261-TN01.WA.DOCX INTRODUCTION This technical note has been prepared to provide clarification on the upgrades required at the completion of Stage 2 on the Elm Street/Pearson Road intersection for the Palm Lake Cooroy Development. Analysis will be undertaken on the traffic generated by Stages 1A and 2 only. METHODOLOGY Analysis of the traffic impacts of Stages 1A and 2 on the external network and on the Elm Street/Pearson Road Intersection have be undertaken adopting the methodology outlined in the Cooroy Retirement Community Traffic Impact Assessment prepared in February 2016 by Calibre Consulting, lodged with initial development package (MCU 15/0111 and REC 15/0031) TRAFFIC GENERATION/DISTRIBUTION Traffic generation from the Cooroy Retirement Community will be limited to Stages 1A and Stage 2 to determine if the existing intersection performs satisfactorily up to the completion of these stages. Stage Proposed Site Activity Number of Units AM Period Trips1 PM Period Trips1 1A Independent Living Units (ILUs) 40 0.5 × 40 = 20 ݒℎ 0.5 × 40 = 20 ݒℎ 2 Independent Living Units (ILUs) 65 0.5 × 65 = 33 ݒℎ 0.5 × 65 = 33 ݒℎ Total 105 53 vph 53 vph Adopting the methodology outlined in the February 2016 report, the directionality of trips in/out of the site is as follows: • In/out split of 30/70 during the AM peak hour, with the reverse during the PM peak hour. • Total two-way 32 vph development traffic at the Elm Street (Cooroy Connection Road)/Pearsons Road intersection. During the morning peak hour, 10 vph travel towards the site, and 22 vph travel away from the site. The reverse is anticipated during the evening peak hour. • Total two-way 21 vph development traffic at the Elm Street (Cooroy Connection Road)/Lamont Road intersection. During the morning peak hour, 6 vph travel towards the site, and 15 vph travel away from the site. The reverse is anticipated during the evening peak hour. 1 Roads and Traffic Authority NSW, “Guide to Traffic Generating Developments” (2002) Calibre Consulting (Qld) Pty Ltd Ground Floor, 545 Queen Street Brisbane Qld 4000 T +61 7 3895 3444 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.