15-001261-TN01.WA
Attached to the e-mail MCU15/0111 - Addendum request to change a development approval - 2-4 Lamonts Rd & 19 Trading Post Rd, Cooroy.
TECHNICAL MEMO
ELM STREET/PEARSONS ROAD INTERSECTION ASSESSMENT
SIDRA ANALYSIS
The traffic volumes for the Elm Street/Pearsons Road intersection has been adjusted to include current anticipated
background traffic volumes and anticipated peak hour development traffic volumes for Stages 1A and 2. Anticipated
intersection traffic volumes including the development traffic, are presented below.
The existing intersection was assessed adopting the traffic volumes shown above in SIDRA to determine intersection
performance and suitability of current configuration. SIDRA results are summarised below.
Degree of Lane Level of 95th Percentile Queue Delay (s)
Scenario
Saturation Service (LOS) Length (m)
Existing AM Peak Hour – Including 14.3
0.388 B 5.5
Stages 1A and 2
Existing PM Peak Hour – Including 13.9
0.334 B 6.8
Stages 1A and 2
The SIDRA results show that the intersection in the existing configuration is operating adequately and has significant
spare capacity with inclusion of development traffic from Stages 1A and 2.
15-001261-tn01.wa.docx 2