2020-10-12 GC Agenda - Item 9 - Attachment 1 - Aircraft Noise Ombudsman Report - Investigation
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Summaries of feedback
7.15 On 1 May, Airservices updated its website to advise that:
We have received a significant number of submissions and responses, and will be
consolidating them for consideration in the final design.
A Summary of Feedback will be released on Airservices website in due course.
7.16 On 10 May Airservices further advised that:
Due to the high number of submissions and correspondence received, we are unable to
respond individually.
7.17 On 7 June 2019, Airservices published the following update on its website:
In response to our community consultation activities, conducted between 20 March and
30 April 2019, we received a considerable amount of feedback, both from the areas
where we consulted on the proposed flight path variations (‘consultation areas’), and
from the broader Sunshine Coast community, where the flight path designs are
consistent with the concept flight paths in the approved EIS.
As a result, we have decided to release summaries of this feedback, and our
consideration of the feedback in the context of the final design development, in three (3)
stages:
Summary of Feedback – Part One (Consultation Areas): Summarises the
feedback received from the communities in the specific areas where we consulted
on proposed flight path variations, and provides an analysis of the themes within this
feedback (released 7 June 2019).
Summary of Feedback – Part Two: Summarises the general feedback received
from communities in the broader Sunshine Coast area, including an analysis of the
themes within this feedback (release date by end of June 2019).
Consideration of Feedback: A summary report on how we have considered the
feedback provided by the Sunshine Coast communities in shaping the final flight
path designs (release date in early July 2019).
7.18 On the same date, it released Summary of Feedback – Part One (Consultation
Areas)24. This report described the target area as encompassing a larger
region that had been identified in the SEP, and included the following suburbs:
Black Mountain Cooroy Mountain Pomona
Cooroy Pinbarren Tewantin
Lake Macdonald Ringtail Creek Tinbeerwah
Ridgewood Cooroibah
Cooran Doonan
24 Airservices Australia, Summary of Feedback Part 1: Sunshine Coast Proposed Airspace and Flight Path
Changes, 7 June 2019, p. 2
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 21