There was a significant media presence before the session
The bulk of the session was devoted to presentations by Sunshine Coast
Council and then by Airservices. Comparatively little time was left for
questions or statements by community representatives or other
participants
While questions by community representatives and others were heard and
responded to by Sunshine Coast Council and Airservices, it could not be
said there was any substantial “discussion” nor any progress made to
address the concerns of the community or to resolve outstanding issues
No final design or Consideration of Feedback Report was available and so
no final design nor any record of Airservices’ consideration of the feedback
received could be addressed or discussed.
Airservices’ proposed final design
7.26 Airservices published its Proposed Final Design and Consideration of
Feedback report on 16 July 2019, finalising its proposed flight path and
airspace designs for implementation at the Sunshine Coast.
7.27 Alternatives proposed by communities during the consultation period were
considered by Airservices. However, most were ruled out on the grounds that:
Alternative flight path designs submitted that were outside the approved EIS concept
flight paths were not able to be progressed at this time28
7.28 However, Airservices did consider nine alternative designs for potential
inclusion on a “register of possible alternatives for further consideration”. Of
these nine alternative designs, Airservices determined that one would be
placed on a Noise Improvement Register for further consideration in the future.
The ‘Engage Airservices’ platform
7.29 At the same time that Airservices published its Proposed Final Design and
Consideration of Feedback report, it launched its ‘Engage Airservices’
platform. This was a genuine initiative by Airservices to add an interactive tool
to its engagement activities, as the functionality became available and in
response to what it heard through its community engagement. Airservices
advised:
During our Sunshine Coast consultation, we received community feedback that you
would like an interactive platform and more resources to assist you in understanding the
flight path changes. Our new Sunshine Coast engagement platform includes:
an interactive map for the Sunshine Coast with the proposed final flight path designs
Community Specific Fact Sheets
Runway Operations infographic poster set, and
FAQs.
28 Airservices Australia, Proposed Final Design and Consideration of Feedback – July 2019, 16 July 2019, p. 27
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.