9 Conclusions
9.1 Airservices has an obligation to inform, consult and constructively engage with
communities potentially affected by proposed flight paths before they are
implemented. Airservices asserts that it can rely upon consultation undertaken
by others in an EIS process to meet this obligation. Airservices must, however,
turn its mind to whether such a consultation was adequate. In this case,
Airservices took no part in the consultations that occurred as part of the EIS
conducted in 2014/15 by the Sunshine Coast Council and did not conduct its
own assessment of that process. It told the ANO that it accepted the approvals
of the Queensland Coordinator General and the Commonwealth Minister for
the Environment to be sufficient evidence that an appropriate process had
taken place.
9.2 Airservices aligned its flight path designs with those in the EIS but also
proposed variations to reduce overflight of some north-west and north-east
communities. However, it was not open to further variations in other areas as
proposed by the community, which could potentially deliver improved
environmental outcomes. Airservices took the position, as described in its
Proposed Final Design and Consideration of Feedback Report29:
Alternative flight path designs submitted that were outside the approved EIS concept
flight paths were not able to be progressed at this time.
9.3 While there had been a consultation process and approvals on the basis of the
EIS, it was apparent from the EIS documentation that the flight paths it
contained were concepts and potentially subject to change over time:
The changes proposed in this chapter represent the flight paths and airspace currently
envisaged by SCA to be adopted for operations on the proposed runway. However,
these concepts are preliminary and future developments in aircraft technology and
navigation systems, as well as development of the Brisbane basin air traffic
management network could result in changes to the proposed airspace. 30
9.4 Airservices’ internal procedure (NOS)31 requires the re-assessment of the
environmental impact of proposed flight paths if more than 18 months has
passed since its last assessment. GHD’s TEIA ensured this requirement was
met. However, the point made in the NOS is that a lot can change over 18
months, let alone over 4 to 5 years and this applies equally to planning the
stakeholder engagements as it does to considering the environmental impacts
associated with a change. The level of population churn in the areas affected
would have been one relevant consideration.
29 ibid, p. 27
30 Sunshine Coast Council, Sunshine Coast Airport Expansion Project – Environmental Impact Statement, 18
September 2014, p. D2-169
31 Airservices Australia, NOS, op. cit. - see paragraph 2.7 above
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.