9.5 The consultative process carried out by Airservices in 2019, however, was
conceived on the basis that the EIS consultations in 2014/15 largely satisfied
its obligations and no further consultation by it was required with those people
potentially affected by aircraft noise in the areas covered by the previous
Sunshine Coast Council processes (the general area). Airservices determined
to directly consult only those potentially affected in areas where it had made
modifications to the 2014/15 concept flight path design (the target area).
“Consultation” with those affected in the general area, described by
Airservices as a community update program, and in Airservices’ SEP as
“activities aimed to inform and update the community on the development and
implementation of Runway 13/31”32, would be the responsibility of the
Sunshine Coast Council, with Airservices providing support.
9.6 This apparent division of responsibilities, produced confusion as the process
continued. Airservices and the Sunshine Coast Council each placed separate
public notices about upcoming consultation activities and complaints show
inconsistent information provided at community consultation sessions by
representatives of the two parties. Airservices did not anticipate the extent of
public interest and did take steps to respond to the changing circumstances. It
also considered the feedback received from general as well as the target
areas. However, Airservices’ decision to only consider varying its final design
from its proposed design where suggested alternatives were aligned to the
EIS concept paths meant that “consultation” with those in the general area
was effectively consultation in name only. The complaints to the ANO
demonstrate that public anger continued to grow through the process and
remained after the consultation period had closed.
9.7 Standards of best practice consultation for major infrastructure projects require
that those consulted have at least some potential to influence the outcome and
contribute to the final position. The International Association for Public
Participation (IAP2)’s Quality Assurance Standard for Community and
Stakeholder Engagement33 adopts the IAP2’s Core Values for public
participation, state that public participation:
is based on the belief that those who are affected by a decision have a right to be
involved in the decision-making process
includes the promise that the public’s contribution will influence the decision
promotes sustainable decisions by recognising and communicating the needs and
interests of all participants, including decision makers
seeks out and facilitates the participation of those potentially affected by or
interested in a decision
seeks input from participants in designing how they participate
provides participants with the information they need to participate in a meaningful
way
communicates to participants how their input affected the decision.
32 Airservices Australia, SEP, op. cit, p.6
33 International Association for Public Participation, Quality Assurance Standard for Community and Stakeholder
Engagement, 2015, p. 10
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 28