10 Recommendations
10.1 When Airservices becomes involved in changed flight path design as a result
of another party’s project, such as for a proposed runway, its obligation to
consult with the community about the environmental effects of aircraft
operations remain. Although this obligation may be discharged in cooperation
with others, the lack of effective coordination between Airservices and
Sunshine Coast Council in this case, makes it clear that any future
assessment of and consultation on environmental impact by Airservices
involving another party will require more careful consideration and, if joint
assessment is to occur, much more careful planning, commitment and
attention from those involved as well as effective governance mechanisms to
ensure that relative responsibilities are adequately discharged. To avoid
similar challenges in the future, Airservices needs to engage early in the
planning stages of third party-initiated projects and maintain an ongoing
interest as the projects progress.
Airservices should develop a framework for third party
proposed changes that:
(a) provides robust and dependable governance
arrangements to manage its early and ongoing
engagement with third parties
(b) establishes clear lines of accountability and documents
these arrangements as they evolve
(c) ensures an effective consultative process, which includes
monitoring the adequacy of any third party consultations
being relied on.
10.2 In considering the wide range of submissions it received and accepting further
representations after the consultation period closed, Airservices acknowledged
that there were some community-suggested alternatives that may offer better
noise outcomes and are worthy of further investigation. In the short timeframe
it had to finalise its designs for CASA approval ahead of the scheduled
implementation date, these could not be properly assessed. However,
Airservices committed to further considering these options as part of its Post
Implementation Review process.
Airservices should, as soon as practicable, design an
effective post-implementation review (PIR) process for the
Sunshine Coast flight path designs, that does not perpetuate
design constraints requiring alignment with EIS concepts,
and which encompasses:
(a) consideration of identified community-suggested
alternatives
(b) a community engagement process that provides for
genuine opportunities for community contributions to
influence decisions
(c) application of the latest version of Airservices’ National
Operating Standard (NOS) Environmental Management
of Changes to Aircraft Operations (AA-NOS-ENV-2.100).
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.