2020-10-12 GC Agenda - Item 9 - Attachment 1 - Aircraft Noise Ombudsman Report - Investigation
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
1 Executive Summary Introduction From 22 April to the end of July 2019, the Aircraft Noise Ombudsman (ANO) received 299 complaints regarding the proposed flight paths to support a new runway at Sunshine Coast Airport in May 2020. The proposed new runway was the subject of an environmental impact statement (EIS) and associated community consultation conducted in 2014/15 by Sunshine Coast Council. At that time, Airservices Australia (Airservices) agreed with the concept flight paths, developed by a private consultant and included in the EIS, but took no part in the community consultation. In April 2018, Airservices commenced detailed design work on the new flight paths, seeking to maintain alignment with the EIS, except where it identified variations that could reduce noise impacts in some communities to the north-west. Airservices engaged a consultant to conduct a Targeted Environmental Impact Assessment (TEIA) of its proposed flight path design. The TEIA recommended implementation of a community engagement plan that covered all areas predicted to experience future aircraft noise and gave residents an opportunity to raise concerns. Community engagement Airservices determined that it achieved this recommendation through reliance on the broader community update program being undertaken by the Sunshine Coast Airport Expansion Project along with its own targeted consultation only with those areas where its proposed flight paths varied from the concept flight paths in the EIS. There was no assessment by Airservices of the adequacy of the EIS community consultations in 2014/15 nor any consideration of population churn or other factors that may have changed in the community since the earlier consultation. Airservices’ consultation occurred during a six week period in March/April 2019. Airservices took responsibility for consultation in areas where the proposed flight paths deviated from those proposed in the 2014/15 EIS (the target area) and provided technical support for Sunshine Coast Council which was responsible for a community update program with the other affected areas (the general area). The community engagement did not go smoothly, with community awareness of the flight path proposals and consultation sessions heavily reliant on community members using their social media and own letterbox drops to reach interested individuals. Airservices’ early notice of the consultation period had suggested that the community in all affected areas would be consulted. Some two weeks into the consultation period, it became more specific that it was only consulting communities in the target area. This division of responsibilities between Airservices and the Sunshine Coast Council caused general public confusion about who was responsible for what. Airservices underestimated the extent of public interest and had to schedule multiple consultation sessions in groups limited to 50, due to the size of the venues it had hired. Complaints to the ANO reported no notice or lack of timely notice of meetings, inconsistent responses between Airservices and Sunshine Coast Council representatives and lack of clarity about who had responsibility for decisions. Aircraft Noise Ombudsman Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.