Original source · versioned page text
2020-10-12 GC Agenda - Item 9 - Attachment 1 - Aircraft Noise Ombudsman Report - Investigation
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Airservices should, as soon as practicable, design an
effective post-implementation review (PIR) process for the
Sunshine Coast flight path designs, that does not perpetuate
design constraints requiring alignment with EIS concepts,
and which encompasses:
(a) consideration of identified community-suggested
alternatives
(b) a community engagement process that provides for
genuine opportunities for community contributions to
influence decisions
(c) application of the latest version of Airservices’ National
Operating Standard (NOS) Environmental Management
of Changes to Aircraft Operations (AA-NOS-ENV-2.100).
Aircraft Noise Ombudsman
Investigation into complaints about the introduction of new flight paths in the Sunshine Coast (April 2020) Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.