Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
establish systems for ongoing psychological/emotional support for affected persons
ensure the redevelopment of social networks and connections
establish ongoing information provision
27.13 The stages and key process elements of infrastructure recovery
The table below describes the basic functions of recovery, together with the major issues at
each stage and the tasks that are normally undertaken. It can be used at a number of
different levels and may be useful in directing overall recovery, recovery of a single service
(e.g. electricity) or even an aspect of a single service (e.g. provision of drinking water
standpipes).
Communicating,
Key recovery Issues / challenges
Tasks / key drivers monitoring and
stages/elements / obstacles
review
Moving from initial Undertake site Establish and maintain
impact assessment to assessment/ inspection information and
the much more records systems (e.g.
detailed assessment timelines, logs, as-
requires a change in constructed drawings)
focus
Establish the extent of Establish who the Communicate with
1. Understand what
the problem Relevant stakeholders stakeholders
needs to be done are
to recover Is the hazard Establish the Establishing the roles
preventing us doing communications network in the recovery
our job on the site between site deployment committee
itself? activity and relevant
stakeholders Continually monitor
and reassess the
problem/ situation
Safe access (physical Establish the Open up
damage, emergency interdependency communication
services, cordons) relationships with other in a meaningful way
Legislative, statutory parties with all the other
and regulatory people who
requirements are involved
Crime scene, coronial Continually monitor
complications presenting constraints
Financial constraints Establish a budget or and adjust own
source of funding/ actions/ activities as
resourcing necessary
Open accounts and lines
Manage, monitor and
of credit with suppliers
2. Identify review financial status
(local where possible)
external Inform LDRC
Logistical (material, Understand relevant
constraints labour) constraints requirements and seek committee of current
relevant permissions/ status of works
exemptions where
required
Environment Source information
(geographical, regarding environment
topographical, (maps, reports, advices
meteorological)
Identify and negotiate Establish additional
a safe access route resource sources as
(road, necessary (material,
rail, airborne, labour—e.g. volunteers,
waterborne) paid volunteers, surge
112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.