Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                           Noosa Local Disaster Recovery Plan 2015/2016

   others as required (dependent on emergency event and local needs).

Community recovery operational activities
Immediate
Conduct immediate impact/needs assessment (0 to 3 days).
What components/services are working/not working?
   priority needs (for affected community and recovery operations)
   safety
   water, food
   emergency accommodation
   transport links
   health
   communications
   power, gas
   recovery management centres
   public facilities
   animal management facilities
What needs to be done to prevent further damage?
What hazards exist?


Short to medium term
Conduct short- to medium-term impact/needs assessment.
What are evolving short- to medium-term needs?
   transport, including public transport
   food and material distribution infrastructure
   power, gas, communications
   drainage, sewage
   temporary accommodation

   reinstatement of services
   temporary solutions/‘work-arounds’
   ‘make safe’ operations
   re-establish retail and commercial facilities essential for community wellbeing or
    recovery activities
   Identify and re-establish community buildings and facilities essential for recovery
    activities and social connectivity
   manage resourcing and ensure supply chains
   identify additional resources that will be required by the affected communities and by
    recovery operations
   availability of supplies —locally, regionally, nationally
   availability of contractors—locally, regionally, nationally


Long term (ongoing)
Identify opportunities to improve infrastructure and services during reinstatement:
   determine if damaged or destroyed services or facilities are still relevant/appropriate to
    the community
   identify opportunities to upgrade infrastructure
   identify opportunities to establish new facilities and services

                                                                                             117
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.