Skip to the record
Accept no substitutions.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                          Noosa Local Disaster Recovery Plan 2015/2016

28.2 Undertake community recovery management/coordination

Keeping pace with the evolving situation
   the LRC immediately establish liaison with LDC and the LDCC
   ensure initial and ongoing impact assessment data feed into recovery programs and
    processes
   continuously review and analyse community needs for service provision planning
   establish processes for information from all avenues (public meetings, call centre or
    recovery centre feedback, debriefings) to feed into planning cycle
   adapt community recovery plans in accordance with the evolving or changing
    community needs and priorities


Engaging and empowering the affected communities
   ensure regular and ongoing engagement with affected persons
   provide leadership, facilitation, support and empowerment
   create opportunities for community leaders to evolve
   create opportunities and support for affected persons and communities to lead and
    manage their own recovery
   allow communities to self-identify
   negotiate and agree on the prioritised tasks based on community needs and
    requirements, including short-term/interim fixes
   build trust through respectful listening and understanding
   establish active feedback processes and opportunities
   maximise the availability of information to affected persons


Managing people
   provide strong, clear and responsive leadership
   ensure safe operating conditions for recovery personnel and community
   ensure that workloads are sustainable by establishing management structures,
    delegating responsibilities and utilising ‘spans of control’
   ensure that recovery workers, managers and volunteers have defined work times and
    adequate rest breaks
   ensure that briefings occur for all oncoming personnel
   ensure that debriefs are conducted at the end of each shift to ensure capture of
    information as well as defusing personnel
   provide opportunities for formal defusing and ongoing emotional and psychological
    support for recovery personnel
   avoid convergence by providing clear information and direction as to how non-impacted
    persons might help
   develop a strategy to manage politicians and VIPs


Managing resources
                                                                                            130
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.