Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
methods and timing of communications
staff arrangements (e.g. shift times, breaks, additional support etc)
time for questions.
Debriefing is important to:
ensure that information is gathered and passed on to oncoming staff
ensure that staff going off duty have an opportunity to defuse and wind down before
leaving the operations site.
Post-recovery
Consideration should be given to:
allowing a reasonable rest break after conclusion of emergency involvement (days)
briefing managers and co-workers about likely staff impact and needs
reducing workload and expectations for a few weeks
backfilling and supporting roles
facilitating emergency staff get-togethers, recognition and ‘thank you’ events
facilitating and enabling ongoing emotional and psychological support
141
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.