Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                            Noosa Local Disaster Recovery Plan 2015/2016

28.7 Managing people

Preparedness
Recovery operations will be most successful and the impact on staff will be minimised where
staff involved:
  have been involved in training and exercising
   are operating in their normal area of expertise
   have clear role statements and operating guidelines
   have clear and supportive management


Operations
For occupational health and safety:
 consider appointing a safety manager
   ensure safety issues are identified and managed and communicated
   establish appropriate duty times
   establish clear roles and responsibilities
For staff involved in the emergency event:
   consider the needs of staff personally affected by the emergency event
Establish formal and informal arrangements for supporting the wellbeing of recovery staff,
including:
  operational briefing and defusing
   mentoring
   food, water and rest breaks
   shorter than normal duty times
   team meetings
   manager briefings on likely impacts and staff needs
   organisational employee assistance programs
   private counselling.
Briefing and debriefing
Undertake briefing sessions for all oncoming staff and at regular intervals during recovery
operations.

Briefings should include:
 overview of the nature and of the impact of the emergency
   overview of recovery purpose and operations
   detail of specific activities (relevant to the area of operations)
   identification of persons in charge, organisations and people involved in the operations
    site
   the actions that have been taken to date
   the actions that are planned for the future
   the actions that are required in this shift period
   the resources that are available and not available
                                                                                          140
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.