Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
6.3 Long term recovery
Long Term Recovery involves the ongoing transition from recovery to normal community
development processes. During this stage, most recovery workers leave and systems start
to wind down as normal business processes return. It is important that this reduction in
recovery support is managed and that documented arrangements are in place locally to
continue to address individual and community recovery needs.
7. Summary
Figure 4 depicts the community driven recovery process as described in this part.
Figure 4 – Community driven Recovery Process
(AEMI Community Recovery Handbook 2)
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.