Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Local Disaster Recovery Plan 2015/2016
Part B – Recovery Arrangements
8. Recovery in the Noosa context
Successful recovery requires an understanding of the context in which the recovery effort
applies. Determining what needs to be done in recovering the community depends on an
understanding of how any particular disaster changes the community from what is
considered normal.
8.1 Community profiles
Profiles of the community across the four pillars of recovery provide recovery planners with a
baseline of what is considered normal in the community. The impact of a disaster can then
be compared to this baseline (profile) to assist in determining where recovery effort is
needed. Profiles for each of the four pillars (Human/Social, Infrastructure, Economic and
Environment) are provided in Appendices 27.2, 27.3, 27.4 and 27.5 to this plan.
9. Queensland’s recovery framework
Figure 5 – Recovery Reporting and Resource Flow
(Queensland Recovery Guidelines)
9.1 Authority for recovery
Noosa Council has the primary responsibility for planning and coordinating recovery
operations within the Noosa Shire. It will be supported in these endeavors by the State and
Australian Governments and the community.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.